Skip to main content

Mayor’s lane rental scheme cuts roadwork disruption

A new study into London’s lane rental scheme shows that since its introduction the amount of serious and severe disruption caused by planned roadworks has been cut by 46 per cent on the capital’s busiest roads, reducing delays for all road users. The scheme, which came into effect in June 2012 on the busiest parts of London’s road network, is designed to encourage utility companies to avoid digging up the busiest roads at peak traffic times. Following the introduction of the scheme, around 90 per cent of
April 11, 2014 Read time: 2 mins
A new study into London’s lane rental scheme shows that since its introduction the amount of serious and severe disruption caused by planned roadworks has been cut by 46 per cent on the capital’s busiest roads, reducing delays for all road users.

The scheme, which came into effect in June 2012 on the busiest parts of London’s road network, is designed to encourage utility companies to avoid digging up the busiest roads at peak traffic times. Following the introduction of the scheme, around 90 per cent of utility works and 99 per cent of works carried out by 1466 Transport for London (TfL) in the lane rental areas have avoided disrupting these busy roads at peak times.

All surplus money raised through the lane rental scheme is reinvested into measures to further reduce the disruption, including: automatic roadwork monitoring cameras, allowing TfL to better determine whether work is taking place on worksites; automatic number plate recognition cameras and automatic traffic counters to capture the effects of a scheme to ensure that it continues to reduce disruption; further investigation into innovative ways of reducing disruption.

Isabel Dedring, Deputy Mayor for Transport, said: “We are delighted by the success of this scheme - which was both a First for London and the UK when it was introduced by the Mayor in 2012. It has already saved Londoners thousands of hours spent stuck in traffic and is set to save them many thousands more.”

Alan Bristow, Director of Road Space Management at TfL, said: “The introduction of the UK’s First lane rental scheme in London has already delivered significant benefits across the capital. By using this scheme to help fund more innovation and world-leading technologies, we can continue to reduce disruption and keep all road users on London’s road network moving.”

For more information on companies in this article

Related Content

  • Assembly urges full speed ahead on new ultra-low emissions zone
    August 6, 2013
    The London Assembly has written to the Mayor Boris Johnson to urge him to look at bringing in a ultra-low emission zone for central London sooner than 2020 and not to restrict plans to new vehicles only. In February this year the Mayor said he wanted to make almost all vehicles driving in central London during working hours zero or low emission by 2020 and asked Transport for London (TfL) to prepare plans for a new ultra-low emissions zone (ULEZ). The London Assembly Environment Committee has now written to
  • £36bn from scrapped HS2 to be spent on 'transport projects' in England
    October 4, 2023
    Money from scaled-back high-speed rail project will be reallocated, insists Rishi Sunak
  • Governments must look beyond short-term spending of public funds
    February 2, 2012
    Phil Pettitt, Chief Executive of innovITS, the UK's ITS Centre of Excellence, argues that governments need to look beyond the short-term when looking to pump-prime economic recovery with public funds. It seems, in the current economic climate, that a 'good' day is one in which no company is announcing job cuts or going into administration. Consumer demand is down and businesses are retrenching, cutting costs and fretting over the consequences of shrinking opportunities and order books. It has not been this
  • All-electronic toll collection success in Denver
    January 30, 2012
    Teri England, Diamond Consulting Services Ltd, describes the E-470's switchover to all-electronic toll collection. In June 2007, the E-470 Public Highway Authority made the business decision to transition to an All-Electronic Toll Collection (AETC) system - in other words, become a cashless road.