Skip to main content

Manila to extend metro line 1

RATP Group subsidiary RATP Dev has been awarded a 20-year contract with the Manila LRT 1 consortium to support operations and maintenance of Manila metro line 1.
October 13, 2014 Read time: 1 min

4223 RATP Group subsidiary RATP Dev has been awarded a 20-year contract with the Manila LRT 1 consortium to support operations and maintenance of Manila metro line 1.

Launched in 1984, Manila metro line 1 is the first light metro system in the Philippines. The 20 kilometre line provides over 170 million passengers per year with north-south transport and is currently undergoing work to extend it by to 30 kilometres with 29 stations by 2018.

RATP group will also provide its expertise to the extension in terms of operations, equipment and infrastructure maintenance, as well as training of local personnel.

For more information on companies in this article

Related Content

  • City of Tampere opts for Transtech LRVs
    October 10, 2016
    The city of Tampere, Finland has selected Transtech, a subsidiary of Skoda Transportation, to supply and maintain the trams for its new tramline project. The contract includes 15-20 ForCity Smart Artic low floor light rail vehicles (LRVs) and maintenance for ten years, with an option for up to an additional 46 trams and extension of the maintenance contract up to 30 years. Contract value is between US$3.6 million (€3.2 million) and US$4.2 million (€3.8 million), depending on the final vehicle quantity.
  • Egis Projects-Sanef consortium sign second major ORT operations contract in Canada
    April 2, 2012
    A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will
  • Transit takes on demanding role
    April 2, 2021
    Community transport - or paratransit - has historically formed the basis of demand-responsive operations. But with new routing technologies, David Crawford sees wider potential
  • Gothenburg’s year of congestion charging
    April 9, 2014
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem