Skip to main content

Malaysian LRT line orders more Bombardier trains

Rail technology specialist Bombardier Transportation and its local partner Hartasuma are to deliver an additional 27 Bombardier Innovia Metro 300 trains for the Kelana Jaya Light Rail Transit (LRT) Line in Malaysia. The order from Prasarana Malaysia Berhad is valued at approximately US$388 million (1.7 billion Malaysian ringgit). The lightweight aluminium Innovia Metro 300 trains can move up to 30,000 passengers per hour, per direction. Once final delivery is completed in 2022, these four-car trains will
March 28, 2017 Read time: 2 mins
Rail technology specialist 513 Bombardier Transportation and its local partner Hartasuma are to deliver an additional 27 Bombardier Innovia Metro 300 trains for the Kelana Jaya Light Rail Transit (LRT) Line in Malaysia. The order from Prasarana Malaysia Berhad is valued at approximately US$388 million (1.7 billion Malaysian ringgit).

The lightweight aluminium Innovia Metro 300 trains can move up to 30,000 passengers per hour, per direction. Once final delivery is completed in 2022, these four-car trains will help to increase reliability and provide high capacity mobility on the capital city's integrated transit network.

Final assembly and interior fit-out for these trains are all being carried out in Malaysia, at the Westport facility of the Bombardier Hartasuma Consortium as part of ongoing initiatives to increase local workforce skills. In addition, the consortium is also increasing transport capacity on the same line through the conversion of the original Bombardier Innovia fleet from 34 two-car to four-car trains with inter-car walkthrough and associated wayside system upgrade, to be completed by 2020.

For more information on companies in this article

Related Content

  • AECOM and PB JV for Los Angeles regional connector
    April 23, 2012
    The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
  • Buses services benefit from seamless Wi-Fi data transfer
    April 9, 2014
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.
  • Nairobi looks to ITS to ease travel problems
    December 21, 2017
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of adequate traffic management systems and poor utilisation of existing road facilities.
  • Kenya WIM system cuts four days off journey times
    March 18, 2014
    Shem Oirere looks at how weigh-in-motion is helping to streamline the trucking industry in Kenya. Kenya, East Africa’s largest economy, is streamlining trucking operations on its section of the 8,800km Northern Corridor. It is both reducing the number of weighbridges and automating the remaining ones in an effort to improve efficiency and eliminate corruption.The Northern Corridor is a major gateway through Kenya to the landlocked countries of Uganda, Rwanda, Burundi, Democratic Republic of Congo and Sou