Skip to main content

Malaysia to invest billions in rail development

Malaysia plans to spend a staggering US$50 billion to develop its rail network over the next seven years, including a high-speed rail linking Kuala Lumpur and Singapore set for 2020, and the urban mass rapid transit system that is rolling out in 2017. Compared to developed countries where rail transport makes up a third of public transportation, Malaysia's share is less than four per cent.
September 12, 2013 Read time: 2 mins
Malaysia plans to spend a staggering US$50 billion to develop its rail network over the next seven years, including a high-speed rail linking Kuala Lumpur and Singapore set for 2020, and the urban mass rapid transit system that is rolling out in 2017.

Compared to developed countries where rail transport makes up a third of public transportation, Malaysia's share is less than four per cent.

Announcing the plans, Prime Minister Najib Razak said: "Once considered a dying industry, railroads have made a strong comeback and are poised to become busier passageways in the years ahead."

The government had invested over US$15 billion since 1990, he said.

"Now, more than ever, we are seeing a massive expansion of the rail network in Asia, including in Malaysia. In a sense, it is a resurgence of rail, as rail not only helped build many nations in their fledgling years, but now there is renewed interest in rail."

The MY Rapid Transit (MRT), when fully operational, will cover a distance of 150 kilometres and provide half of the public transport services in the Klang Valley. Commuter train services will also be expanded with the electrified double track railway. Spanning 1,000 kilometres from Padang Besar in the north, to Johor Bahru in the south, the project is expected to cost the government over US$13 billion.

Despite massive cost overruns and project delays, KTM, as well as the government, want the electrified double track rail to be ready two years ahead of the scheduled completion of the high-speed rail linking Kuala Lumpur and Singapore by year 2018.

Malaysia's technical team will begin discussions with its Singapore counterpart next month. Negotiations may take up to twelve months before the tender process begins. Construction is expected to begin by 2015, before the scheduled take off in 2020.

Related Content

  • July 9, 2013
    Indra to implement control centre for Kuala Lumpur LRT and monorail
    Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
  • July 29, 2013
    Asian high speed rail link tender expected late 2014
    Officially launched in February 2013, tenders for the high-speed rail link project between Kuala Lumpur and Singapore will be received towards the end of 2014, Mohd Nur Kamal, the CEO of Malaysia's Land Public Transport Commission (SPAD) has announced. Although the two governments continue to work on technical details and feasibility studies, various parties have already voiced an interest. The railway, which will connect the two countries at speeds exceeding 300 km/h, will reduce the journey time between t
  • February 8, 2016
    LG wins major MRT deal in Malaysia
    LG CNS, the system integration division of LG, is to provide its fleet management system (FMS) solution for Malaysia’s mass rapid transit (MRT) system for a project to establish a feeder bus system throughout the 31 MRT stations in Kuala Lumpur and streamline the city’s transportation flow. The US$10 billion contract also includes smart cards, automated payment systems and a central control centre solution. The feeder bus complements urban rapid buses covering longer distances and offers mobility within
  • February 8, 2017
    AECOM to design Singapore’s high speed rail infrastructure
    Singapore’s Land Transport Authority (LTA) has appointed AECOM Singapore to conduct the advanced engineering study (AES) for the complete design of the high speed rail (HSR) infrastructure within Singapore. This includes providing architectural, civil, electrical, mechanical and other design services required for the Jurong East terminus, tunnels, and the bridge across the Straits of Johor. The Kuala Lumpur-Singapore HSR is a strategic project between the Governments of Malaysia and Singapore that aims t