Skip to main content

Major rail order for Kapsch

Kapsch CarrierCom has won a further order worth US$56 million from the Polish railway company PKP for the design, delivery and installation of the GSM-R train radio system on the stretch of line E20 from Kunowice to Terespol. The 26-month project will be implemented in cooperation with local partner Torpol. Kapsch will install 114 base transceiver stations (BTS) at 57 locations. In addition, base station controllers (BSC), transcoder units (TCU) and packet control unit support nodes (PCUSN) will be supp
November 18, 2013 Read time: 1 min
81 Kapsch CarrierCom has won a further order worth US$56 million from the Polish railway company PKP for the design, delivery and installation of the GSM-R train radio system on the stretch of line E20 from Kunowice to Terespol.

The 26-month project will be implemented in cooperation with local partner Torpol. Kapsch will install 114 base transceiver stations (BTS) at 57 locations. In addition, base station controllers (BSC), transcoder units (TCU) and packet control unit support nodes (PCUSN) will be supplied and integrated.

Kapsch will be responsible for the design and implementation of the GSM-R project, while Torpol will provide infrastructure and a fibre-optic network.

For more information on companies in this article

Related Content

  • Kapsch TrafficCom to provide mobile ticketing system for MARTA transit system
    July 6, 2017
    Kapsch TrafficCom has been awarded a contract to design, develop, implement, support and maintain a turnkey regional mobile ticketing system (MTS) by the Metropolitan Atlanta Rapid Transit Authority (MARTA).
  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • Indra’s railway control technology to be installed on Spanish rail lines
    July 22, 2014
    Indra is to deploy its advanced railway control, security and signalling technology on the high-speed rail lines between Valladolid and Leon and Venta de Baños and Burgos in Spain. The contract, worth more than US$47 million also includes facility maintenance. Indra will deploy the centralised traffic control system on the new line, together with auxiliary detection systems and security sensor concentrators, based on an innovative Indra safety platform. This is the vital processing system that guarantee
  • Thales to implement traffic control system on Spanish rail line
    October 7, 2015
    Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved