Skip to main content

M6 should be priority for Government investment, drivers tell FTA

The Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots. Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Ox
December 20, 2016 Read time: 2 mins
The 6983 Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots.
 
Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Oxford, Milton Keynes and Cambridge.
 
Road delays are a constant issue for FTA members who move goods throughout the UK. It costs around £1 a minute to run a 44-tonne truck so any hold-ups have a huge financial impact on operations.
 
FTA identified the M60 north of Manchester, the M25 to the west of London and the M6 north of Birmingham as three of the most highly congested roads and ran a Twitter poll asking drivers which they thought needed most attention. The M6 narrowly came out on top with 39% of the vote, with the M25 on 37 per cent and the M60 on 24 per cent.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy, said: “Every motorist will have view on where the worst spots are on our strategic network and these figures for our poll show that there is a split opinion. It is therefore vital that we get the next programme of roads spending to address the concerns on congestion.”

For more information on companies in this article

Related Content

  • Bedfordshire police speed camera proposals ‘unhelpful’
    November 9, 2015
    A UK enforcement expert and the Institute of Advanced Motorists (IAM) have branded as ‘unhelpful’ the proposal by Olly Martins, Police Commissioner for Bedfordshire to use money from speed camera fines to fill a shortfall in police funding. Martins told the Home Affairs Select Committee that the force was ‘stretched to the limit’ and said, "We’ve extensively lobbied the Home Office for fair funding but they haven’t listened and the Chancellor's spending review at the end of the month means we face more c
  • Bali launches first all-vehicle tolled highway
    September 25, 2013
    The launch of Bali’s first all-vehicle tolled highway on 23 September is expected to ease congestion in an area increasingly famous for its notorious traffic. The country already has a toll road especially for motorcycles. The project is designed to reduce congestion on the 12.7 kilometre Benoa-Kuta-Nusa Dua stretch, at a cost of US$217 million. The road runs over the sea and was built using 33,835 concrete columns, some of them through an area of mangrove forest.
  • Integrated transport network proposed for Montréal
    April 25, 2016
    DPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project. Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week. The solution proposed by CDPQ Infra wi
  • Highways Agency launches A14 consultation
    April 9, 2014
    As a result of the public consultation to consider route options for the A14 Cambridge to Huntingdon improvement scheme, the proposed scheme has been developed in more detail and plans to toll the road have been dropped. Changes that have been made in response to feedback from last year’s consultation include improvements to four junctions on the route and an updated local access road been proposed between two villages. The Highways Agency has now launched a ten-week consultation period, which forms par