Skip to main content

M2M and partner consortium developing infrastructure for electric vehicle charging

Telekom Austria Group M2M and its partner consortium is working to develop a complete infrastructure for the charging of Electric Vehicles (EVs) which includes navigation, billing and authorisation, load management and balancing, and reservations (including reservation with payment in order to stop charging point blocking).
October 24, 2012 Read time: 2 mins
Julia Holbock shows off M2M's plans
Telekom Austria Group M2M and its partner consortium is working to develop a complete infrastructure for the charging of Electric Vehicles (EVs) which includes navigation, billing and authorisation, load management and balancing, and reservations (including reservation with payment in order to stop charging point blocking).

The group started work to realise a national network in 2010 and at present there are around 30 charging points nationally. Some are free-standing, although in order to make best possible use of existing infrastructure some have been combined with phone booths; nationally, around 15 per cent of the country’s 15,000 phone booths are anticipated to be well-placed to also serve as EV fuelling points.

“Two years ago we saw a lot of hype pertaining to EVs, then a bit of a slow-down. But OEMs’ development cycles take between five and seven years, and we’re now starting to see EVs emerge at a price point which are accessible to more than just the early adopters,” says Friedrich Vogel of the partner consortium. “Once serial production starts, marketing of EVs will follow and at around 2013/14 I expect to see a tipping point for e-Mobility.

“At that point, if I have a car that can offer 500km with a range extender or 100km on battery, with less pollution and tax, why am I going to buy a hydrocarbon car? But if we don’t have the charging infrastructure in place, acceptance and adoption will be much lower.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal <span class="mouselink">www.m2m.telekomaustria.com </span> www.m2m.telekomaustria.com false http://www.m2m.telekomaustria.com%20/ false false%>

Related Content

  • Test
    August 10, 2016
    %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 4 9782 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Events (Diary)
  • Test
    August 10, 2016
    %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 4 9782 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Events (Diary)
  • Iteris webinar – maximise the value of NPMRDS
    December 10, 2014
    The latest webinar by Iteris, ‘MAP-21 Solutions: Leveraging NPMRDS for Performance Measurement’ on Wednesday, 17 December 17 at 11 a.m. EST will inform participants how to maximise the value of their NPMRDS data set. As MAP-21 increases requirements for performance measurement and reporting, having the tools to effectively analyse transportation system data is a must. With the availability of the National Performance Management Research Data Set (NPMRDS) from FHWA, agencies have access to Big Data for th
  • EVs providing power to Portuguese island
    June 17, 2019
    Electric vehicles (EVs) are being used to power people’s homes on an island in the Atlantic Ocean. Part of Portugal’s Madeira archipelago, Porto Santo is using solar-powered EVs, according to a BBC report. They are charged during the day, with unused energy returned to the grid at night. The Portuguese island is not the only part of the world seeking to harness the potential of solar energy for EVs. In India, Bharat Heavy Electricals is setting up a network of solar-based electric vehicle