Skip to main content

M2M and partner consortium developing infrastructure for electric vehicle charging

Telekom Austria Group M2M and its partner consortium is working to develop a complete infrastructure for the charging of Electric Vehicles (EVs) which includes navigation, billing and authorisation, load management and balancing, and reservations (including reservation with payment in order to stop charging point blocking).
October 24, 2012 Read time: 2 mins
Julia Holbock shows off M2M's plans
Telekom Austria Group M2M and its partner consortium is working to develop a complete infrastructure for the charging of Electric Vehicles (EVs) which includes navigation, billing and authorisation, load management and balancing, and reservations (including reservation with payment in order to stop charging point blocking).

The group started work to realise a national network in 2010 and at present there are around 30 charging points nationally. Some are free-standing, although in order to make best possible use of existing infrastructure some have been combined with phone booths; nationally, around 15 per cent of the country’s 15,000 phone booths are anticipated to be well-placed to also serve as EV fuelling points.

“Two years ago we saw a lot of hype pertaining to EVs, then a bit of a slow-down. But OEMs’ development cycles take between five and seven years, and we’re now starting to see EVs emerge at a price point which are accessible to more than just the early adopters,” says Friedrich Vogel of the partner consortium. “Once serial production starts, marketing of EVs will follow and at around 2013/14 I expect to see a tipping point for e-Mobility.

“At that point, if I have a car that can offer 500km with a range extender or 100km on battery, with less pollution and tax, why am I going to buy a hydrocarbon car? But if we don’t have the charging infrastructure in place, acceptance and adoption will be much lower.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal <span class="mouselink">www.m2m.telekomaustria.com </span> www.m2m.telekomaustria.com false http://www.m2m.telekomaustria.com%20/ false false%>

Related Content

  • ETSI standards available to all on CD-ROM
    October 24, 2012
    Visit ETSI, the European Telecommunications Standards Institute, on stand P32 to discover the latest developments in European standardisation and to pick up a copy of ETSI’s CD-ROM collection of transportation related standards. ETSI develops standards for all aspects of ITS communication systems, working in close cooperation with other standards bodies including CEN, ISO, IEEE and with the Car2Car Communication Consortium. Interoperability is key, so ETSI, with Ertico, organises events for suppliers of coo
  • Webinar - Powering ITS anywhere, anytime with solar energy solutions
    December 8, 2016
    SES America (SESA) is hosting a webinar on 15 December, dedicated to solar ITS solutions, from 1300-1400 ET, 1000-11000 PT. The webinar, Powering ITS anywhere, anytime with solar energy solutions, will discuss the seven myths about solar-powered DMS (dynamic message signs) and why the rise of solar power has paved a way for ITS. It will also discuss how to calculate an optimised solar ITS system.
  • Q&A: HID GLOBAL
    November 3, 2014
    Harm Radstaak, managing director EMEA with HID Global, talks about layered security and a future in which a single card or phone is all customers need
  • India ‘to consider single tag’ for all toll roads
    October 8, 2019
    Indian transportation officials will meet this month (October) to discuss implementing a ‘One Nation One Tag’ policy to replace multiple smart tags being used on toll roads. The Times of India says the Fastag RFID-based smart tag is being used to pay tolls on the national highway network – but that commercial vehicles must have a separate tag to enter Delhi. An unnamed official is quoted as saying: "Why should people be made to buy multiple smart tags to pay toll on different roads? There have been comp