Skip to main content

Luton to Dunstable guided busway opens

Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
September 25, 2013 Read time: 2 mins
Following many years of planning, the Luton and Dunstable guided busway is now open to the public.  The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.

A 7.5 kilometre section of the busway is ‘guided’, using the disused Luton-Dunstable railway corridor, through which buses will use a fixed corridor formed from six metre long precast concrete beams. This allows standard buses, fitted with two small guide wheels, to join and leave the track, and travel on it in both directions smoothly and safely at speeds of up to 50 miles per hour.

Designed and built for Luton Borough Council and Central Bedfordshire Council by a joint venture comprising 4983 Parsons Brinckerhoff, Arup and Bam Nuttall, the innovative transportation project will relieve traffic congestion in the region through the provision of a dedicated route for public transport.

The work included the construction of seven new bridges and refurbishment/reconstruction of three bridges along the route, the construction of four new high specification bus stops and a major bus interchange at Luton railway station - resulting in links to Luton town centre, the railway network and providing easy access to Luton airport.

For more information on companies in this article

Related Content

  • EBRD connects Kosovo to European Railway network
    September 7, 2015
    The European Bank for Reconstruction and Development (EBRD) is providing a senior loan of US$44.5 million to finance the modernisation of Kosovo’s railway infrastructure, deepening regional integration and strengthening the country’s economic development. The loan to Infrastruktura e Hekurudhave të Kosovës (Infrakos), the national railway infrastructure company, will provide funding to upgrade Kosovo’s only international rail link, Rail Route 10. The 148 kilometre-long line is divided into three section
  • STV selected to design Massachusetts rail extension
    May 10, 2018
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • Heart of Slough implements Siemens wireless traffic detection
    February 21, 2013
    As part of the Heart of Slough improvement project, new traffic intersections across seven key sites in and around Slough, UK have been equipped with a total of 162 Siemens WiMag wireless magnetometer sensors by Siemens to help improve the management of traffic using the A4 and travelling to and from the town centre. Complementing the company’s proven loop and radar detection solutions, the sensors provide the Heart of Slough project with an alternative traffic detection system that uses magnetic disturbanc
  • Barriers tailor-made for Swedish motorway project
    December 4, 2014
    Traffic management barriers developed by Belgian access control systems are being used on the Norra Länken motorway project in Sweden, supplied through its local partner Swarco. Built in cooperation with the city of Stockholm and co-financed by the European Union, Norra Länken is five kilometres long with four kilometres in tunnels and is said to be northern Europe’s largest road tunnel project. Two types of barrier have been installed on the project, the BL77 security barrier and the extra long BL52