Skip to main content

London's new Silvertown Tunnel set to open

TfL says average peak journey times expected to be 20 minutes quicker
By Adam Hill January 13, 2025 Read time: 2 mins
Tunnel vision (© Hupeng | Dreamstime.com)

The new Silvertown Tunnel beneath the River Thames in the east of London, UK, is set to open on 7 April 2025.

The 1.4km-long twin-bore tunnel has two lanes per tunnel with dedicated lanes for heavy goods vehicles and buses. 

Indra has equipped the new structure with its In-Mova Traffic platform and intelligent transport systems including communication systems, radio communications network and traffic signals. 

Citilog has integrated its automatic incident detection system, which includes 59 CCTV cameras, to help reduce congestion in and around the tunnel. It provides real-time incident detection and response to enhance safety and incident management, and is designed to minimise false alarms while maintaining high detection accuracy.

Using thousands of video clips will help train an advanced network to reduce false positives, allowing operators to focus on genuine emergencies.

The new tunnel runs between the London borough of Greenwich, the peninsula area, and West Silvertown on the northern bank of the Thames.

Transport for London (TfL) says modelling shows it will help reduce congestion at the existing Blackwall Tunnel, with average journey times expected to be up to 20 minutes quicker at peak times.

It will also help manage overall air quality and allow for better cross-river public transport, TfL says, with new bus routes - free for the first year - meaning that bus crossings increase from six to 21 per hour.

While you will not be able to walk or cycle through the tunnel, a new zero-emission cycle-shuttle service is due to operate every 12 minutes, seven days a week.

Related Content

  • September 13, 2024
    Tees Valley signals Fusion roll-out
    Yunex Traffic solution will bring adaptive tech to towns and regions in northern England
  • November 17, 2014
    Jenoptik supplies sophisticated multi-section control project
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • July 8, 2019
    London needs just one road user charge, says report
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London
  • August 4, 2015
    Thales to upgrade four London Underground lines
    French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre