Skip to main content

London Underground installs EV charge points

Siemens has completed the supply and installation of charging infrastructure for electric vehicles in twelve London Underground car parks across the capital for UK Power Network Services. The new network of sixty Siemens AC intelligent charge posts is fully integrated into Source London, the UK's largest electric vehicle membership scheme, with over 1,300 charge points. The charge points are supported by associated services including management, operation and maintenance and the supply of charging post m
August 28, 2013 Read time: 2 mins
189 Siemens has completed the supply and installation of charging infrastructure for electric vehicles in twelve London Underground car parks across the capital for UK Power Network Services. The new network of sixty Siemens AC intelligent charge posts is fully integrated into Source London, the UK's largest electric vehicle membership scheme, with over 1,300 charge points.

The charge points are supported by associated services including management, operation and maintenance and the supply of charging post management software to operate the back offices.

Siemens charging solutions are designed, built and installed for long term deployment and high level of usage. Each charging point can charge two vehicles simultaneously, reducing installation and maintenance costs and maximising space. They can be easily tailored to charging requirements and allows the integration of calibrated meters for the exact billing of charged energy and/or feed-in meters for the exact offsetting of energy input with electricity providers.

Mark Bonnor-Moris, head of electromobility, UK Siemens said: ‘This significant EV infrastructure project provides UK Power Network Services, Source London and London Underground with credible and experienced supply, delivery, management and operation. ‘This major project further demonstrates transition from low-power ‘trickle’ on-street electric vehicle charging to high-power and rapid industry-grade facilities, increasing investment and the utilisation of electric vehicles’.

For more information on companies in this article

Related Content

  • Future traffic management needs new thinking, new technology
    January 23, 2012
    One of the biggest problems facing US ITS professionals, says Georgia DOT's Hugh Colton, is the constrained thinking which is sometimes forced upon those making procurement decisions. It is time, he says, to look again at how we do things. In the November/December 2010 edition of this journal, Pete Goldin interviewed Joseph Sussman, chairman of the US's ITS Program Advisory Committee. Amongst other observations that Sussman made was that, technologically, ITS in the US is 10 years behind that in the world-l
  • Lidar: recipes for success
    March 28, 2022
    Lidar is being deployed all over the world - and you can even read a cookbook on the subject...
  • Don’t look at the jigsaw pieces – see the whole puzzle, says CCTA
    February 19, 2024
    There are three main barriers to taking transport ideas from the pilot stage to real-life usage: incompatible technology, local control and limited funding. Tim Haile of California’s Contra Costa Transportation Authority has some thoughts on how to overcome them
  • FTA says new London road charging proposals present opportunities and challenges
    June 22, 2017
    The UK’s Freight Transport Association (FTA) says new proposals announced by the Mayor of London for road charging based on elements such as distance travelled and vehicle emissions could be a positive step for freight operators, provided they don’t simply add cost.