Skip to main content

London Underground installs EV charge points

Siemens has completed the supply and installation of charging infrastructure for electric vehicles in twelve London Underground car parks across the capital for UK Power Network Services. The new network of sixty Siemens AC intelligent charge posts is fully integrated into Source London, the UK's largest electric vehicle membership scheme, with over 1,300 charge points. The charge points are supported by associated services including management, operation and maintenance and the supply of charging post m
August 28, 2013 Read time: 2 mins
189 Siemens has completed the supply and installation of charging infrastructure for electric vehicles in twelve London Underground car parks across the capital for UK Power Network Services. The new network of sixty Siemens AC intelligent charge posts is fully integrated into Source London, the UK's largest electric vehicle membership scheme, with over 1,300 charge points.

The charge points are supported by associated services including management, operation and maintenance and the supply of charging post management software to operate the back offices.

Siemens charging solutions are designed, built and installed for long term deployment and high level of usage. Each charging point can charge two vehicles simultaneously, reducing installation and maintenance costs and maximising space. They can be easily tailored to charging requirements and allows the integration of calibrated meters for the exact billing of charged energy and/or feed-in meters for the exact offsetting of energy input with electricity providers.

Mark Bonnor-Moris, head of electromobility, UK Siemens said: ‘This significant EV infrastructure project provides UK Power Network Services, Source London and London Underground with credible and experienced supply, delivery, management and operation. ‘This major project further demonstrates transition from low-power ‘trickle’ on-street electric vehicle charging to high-power and rapid industry-grade facilities, increasing investment and the utilisation of electric vehicles’.

For more information on companies in this article

Related Content

  • Consortium to study UK eHighway feasibility 
    August 11, 2021
    Partners including Siemens hope overhead electricity lines will serve major roads by 2030s
  • TfL appoints electric vehicle charge point operators
    April 27, 2017
    Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi
  • GridMatrix goes back to the future in New York City
    September 25, 2023
    Legacy traffic management infrastructure doesn’t have to be a marker of the past: software upgrades can bring it into the present in a cost-effective and timely way, says Gordon Feller
  • Vienna’s first electric bus goes into operation
    October 31, 2012
    The first electric bus (eBus) to be used in Austria’s capital city of Vienna has been put into service by the municipal transport authority, Wiener Linien, the first operator in Europe to implement and integrate eBuses into scheduled service. Designed and developed by Siemens Rail Systems and bus manufacturer Rampini, the vehicle is the first of twelve with which Wiener Linien intends to move two of the city's bus services to electric power by the summer of 2013. The vehicle’s total energy requirement is st