Skip to main content

London Underground begins search for supplier of 'new Tube for London'

London Underground (LU) has begun the search for a supplier to build the 'new Tube for London, the next generation of deep-level, energy efficient, walk-through and air-cooled Tube trains. The new trains, capable of full automation, will operate on the Bakerloo, Central, Piccadilly and Waterloo and City line and will enable more frequent and reliable services, boosting capacity and making journeys better and more comfortable for customers. 250 new trains will include air-cooling for the first time on
March 3, 2014 Read time: 1 min
London Underground (LU) has begun the search for a supplier to build the 'new Tube for London, the next generation of deep-level, energy efficient, walk-through and air-cooled Tube trains.

The new trains, capable of full automation, will operate on the Bakerloo, Central, Piccadilly and Waterloo and City line and will enable more frequent and reliable services, boosting capacity and making journeys better and more comfortable for customers.

250 new trains will include air-cooling for the first time on deep-level sections of the Tube, a challenge thought to be almost impossible to overcome until now.

LU has places a notice with the Official Journal of the European Union (OJEU) seeking expressions of interest to build the new trains. A formal invitation to tender is expected to be issued in early 2015.

Related Content

  • May 2, 2018
    Running on empty
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • May 7, 2014
    Underground DART plan back on track
    Irish Rail is set to proceed with the US$2.8 billion underground second DART rail line through the heart of Dublin city centre, following a recent High Court decision which gave the green light for the project. The line, which would run from Docklands to Inchicore, would complete the trebling of the Greater Dublin area's rail service capacity from 33 million passenger journeys annually now to 100 million passenger journeys upon completion.
  • June 2, 2014
    Strike action prompts commuters to try something different
    David Crawford highlights responses to transit disruption on both sides of the Atlantic. Shortly before workers at San Francisco Bay Area Rapid Transit (BART) began a lengthy round of pay and conditions-related strikes in summer 2013, impacting on the daily lives of 400,000 communities, online ridesharing group Avego publicised a new web address: bartstrike.com. By the start of the following week, Avego was encouraging stranded commuters to download its smartphone app by offering them the chance in a raffle
  • July 8, 2019
    London needs just one road user charge, says report
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London