Skip to main content

Lighting upgrade for Mersey tunnel

Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
November 6, 2014 Read time: 2 mins
Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels.

The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fittings.

All the supply cables are original, as is the existing electrical service distribution and associated distribution panels and are therefore over 40 years old.

The improvements are needed to upgrade both the light fittings and wiring, which is aluminium as opposed to copper and is nearing the end of its design life. The existing electrical infrastructure was installed 40 years ago.

The cables run behind the cladding at road deck level, providing the potential for a single point of failure. In the event of a large fire or collision adjacent to the cladding, the cables would fail, resulting in loss of supply to all sections of the tunnel lighting. Currently, there is no emergency or back-up lighting in the tunnel.

The plan is to replace the lighting within the two Kingsway Tunnel bores with more efficient LED modules with a design life of 25 years. The new design will also include battery-backed emergency lighting throughout the length of the two tunnel bores.

Related Content

  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • ASECAP examines tolling during downturns
    September 22, 2014
    ASECAP debated the impact of the financial crises on Europe’s tolling companies and considered the future in diverse economies. Colin Sowman picks some of the highlights. This year ASECAP (Association Europeenne des Concessionnaires d’Autoroutes et d’Ouvrages a’ Peage, with members in 21 countries managing 46,000km of roadway) held its annual Study & Information Days in Athens, Greece – one of the country hardest hit by recent economic problems. While the theme of the conference, Ensuring Sustainability in
  • Truck platooning: the evidence is complex
    February 6, 2020
    A number of claims are made for the value of truck platooning. David Crawford looks at the figures from a new set of examples which suggest that the situation is more complex than you might think