Skip to main content

Lighting upgrade for Mersey tunnel

Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
November 6, 2014 Read time: 2 mins
Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels.

The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fittings.

All the supply cables are original, as is the existing electrical service distribution and associated distribution panels and are therefore over 40 years old.

The improvements are needed to upgrade both the light fittings and wiring, which is aluminium as opposed to copper and is nearing the end of its design life. The existing electrical infrastructure was installed 40 years ago.

The cables run behind the cladding at road deck level, providing the potential for a single point of failure. In the event of a large fire or collision adjacent to the cladding, the cables would fail, resulting in loss of supply to all sections of the tunnel lighting. Currently, there is no emergency or back-up lighting in the tunnel.

The plan is to replace the lighting within the two Kingsway Tunnel bores with more efficient LED modules with a design life of 25 years. The new design will also include battery-backed emergency lighting throughout the length of the two tunnel bores.

Related Content

  • Copenhagen to showcase ITS in action at ITSWC 2018
    December 18, 2017
    As delegates head for the 2017 ITS World Congress in Montreal, we talk to Copenhagen mayor Morten Kabell about why his city is the ideal location for next year’s event. It may have been a long time coming but the ITS World Congress will be in Copenhagen in 2018 and there can be few more fitting places to host the event. By any number of metrics - interconnected transport, cycle commuting, safer streets, reduced pollution, sustainable energy and quality of life - the Danish capital has implemented what m
  • Major road projects to improve journeys in Merseyside and Cheshire
    September 1, 2017
    Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK. Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.
  • Freight poses growing problem for city authorities
    March 3, 2017
    Wes Guckert considers possible solutions and countermeasures to the problems of increased freight deliveries in growing cities. In January 2016, the US Department of Transportation (USDoT) conducted a session on the SmartCity Challenge and Urban Freight and Logistics. This session was a follow-up to the USDoT report titled, Beyond Traffic 2045.
  • Nyx technology Arizona acquires lighting technology for Queen creek tunnel upgrade
    October 11, 2017
    Nyx Hemera Technologies has announced the installation tunnel lighting control system (TLACS) with Holophane's luminaires in the Queen-Creek tunnel in Arizona. The $3 million (£2,273,000) project is funded Department of Transportation in Arizona as part of ongoing efforts to upgrade the state road network’s efficiency and security. The project involves removing the existing interior lighting, installing an LED lighting system and intelligent control system, replacing the exterior lighting at both ends of