Skip to main content

Lighting upgrade for Mersey tunnel

Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
November 6, 2014 Read time: 2 mins
Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels.

The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fittings.

All the supply cables are original, as is the existing electrical service distribution and associated distribution panels and are therefore over 40 years old.

The improvements are needed to upgrade both the light fittings and wiring, which is aluminium as opposed to copper and is nearing the end of its design life. The existing electrical infrastructure was installed 40 years ago.

The cables run behind the cladding at road deck level, providing the potential for a single point of failure. In the event of a large fire or collision adjacent to the cladding, the cables would fail, resulting in loss of supply to all sections of the tunnel lighting. Currently, there is no emergency or back-up lighting in the tunnel.

The plan is to replace the lighting within the two Kingsway Tunnel bores with more efficient LED modules with a design life of 25 years. The new design will also include battery-backed emergency lighting throughout the length of the two tunnel bores.

Related Content

  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • Smoothing out city freight movements
    May 28, 2014
    David Crawford welcomes a national first. Urban freight movements, while commercially and socially vital, are a growing logistical headache for planners and people alike. Figures from France’s Lyon Laboratory of Transport Economics indicate that goods transport in major urban areas accounts for: 20% of traffic; 35% of CO2 emissions made by all urban trips; and 50% of the diesel used; while final km delivery runs account for 20% of the total cost of the transport chain.
  • Latest ITS technology upgrades India's toll systems
    November 13, 2012
    An ambitious programme of new and upgraded interoperable toll systems has been launched in India, featuring far-reaching technology developments. David Crawford reports. In April this year, Indian Union Minister for Road Transport & Highways CP Joshi inaugurated a new era of electronic toll collection (ETC) in India when he unveiled the country’s first RFID-based tolling installation. This was at a recently-completed plaza at Chandimandir, near the city of Panchkula in the northern state of Haryana. The sys
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab