Skip to main content

Let the games begin: modernisation work at Rio airport is complete

Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year. The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to
June 23, 2016 Read time: 2 mins
Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by 1894 thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year.

The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to new passenger boarding bridges which use innovative safety technologies, featuring a European-standard automated docking system that allows precise measurement of gaps and minimises damage to the aircraft. This is particularly important when handling the world’s biggest passenger aircraft, the A380, as at least two bridges are needed per aircraft. RIOgaleão is the only airport in Brazil able to receive an aircraft of this size.

The positive effects of the airport’s modernisation are already having an effect; new airlines have added the airport to their schedules, while existing users such as Lufthansa are increasing the frequency of their flights to and from Rio.

For more information on companies in this article

Related Content

  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • Sice systems future proof Fehmarnbelt Tunnel
    April 4, 2023
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • Siemens shows intelligent solutions
    June 14, 2016
    Siemens is here at ITS America 2016 San Jose at a time when continuous urbanisation, constantly increasing traffic volumes, and more and more apparent negative environmental changes present challenges to cities and municipalities that call for innovative solutions. “With two-thirds of the world’s population expected to live in cities by 2050, we can’t expect to sustain economic success and a growing population without addressing our infrastructure,” said Marcus Welz, president of Siemens
  • Monitoring and transparency preserve enforcement's reputation
    July 30, 2012
    What can be done to preserve automated enforcement's reputation in the face of media and public criticism? Here, system manufacturers and suppliers talk about what they think are the most appropriate business models. Recent events in Italy only served to once again to push automated enforcement into the media spotlight. At the heart of the matter were the numerous alleged instances of local authorities and their contract suppliers of enforcement services colluding to illegally shorten amber signal phase tim