Skip to main content

Let the games begin: modernisation work at Rio airport is complete

Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year. The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to
June 23, 2016 Read time: 2 mins
Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by 1894 thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year.

The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to new passenger boarding bridges which use innovative safety technologies, featuring a European-standard automated docking system that allows precise measurement of gaps and minimises damage to the aircraft. This is particularly important when handling the world’s biggest passenger aircraft, the A380, as at least two bridges are needed per aircraft. RIOgaleão is the only airport in Brazil able to receive an aircraft of this size.

The positive effects of the airport’s modernisation are already having an effect; new airlines have added the airport to their schedules, while existing users such as Lufthansa are increasing the frequency of their flights to and from Rio.

For more information on companies in this article

Related Content

  • Rotterdam links airport with metro via autonomous bus
    July 24, 2025
    Karsan's Level 4 e-Atak buses can reach speeds of up to 40km/h
  • Alstom wins new Kochi metro line contracts
    January 23, 2015
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • C/AVs could mean cheaper roads
    October 28, 2019
    The safety benefits of C/AVs have long been promoted – but research suggests they should also contribute to cheaper roads. David Crawford investigates the potential benefits in infrastructure costs Building narrower freeway lanes to accommodate the enhanced route-tracking capabilities of connected and autonomous vehicles (C/AVs), running in platoon conditions, could result in cost savings of £0.5 million (€0.56 million or US$6.5 million) for every km of road length built. Such benefits could be secur
  • Optibus is rescheduling Brazil's rainforest metropolis Manaus
    February 22, 2024
    AI and cloud computing platform will be used to improve timetable optimisation