Skip to main content

Let the games begin: modernisation work at Rio airport is complete

Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year. The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to
June 23, 2016 Read time: 2 mins
Nearly two months ahead of the start of the 2016 Olympic Games, modernisation work at Rio de Janeiro–Antonio Carlos Jobim International Airport, known locally as RIOgaleão, has been completed. The 25 elevators, 21 escalators, 14 moving walks and 58 passenger boarding bridges supplied by 1894 thyssenkrupp will ensure quick and convenient transportation for over 17 million passengers who visit the airport every year.

The airport’s newly built Terminal 3 now houses a 100 metre long moving walkway, in addition to new passenger boarding bridges which use innovative safety technologies, featuring a European-standard automated docking system that allows precise measurement of gaps and minimises damage to the aircraft. This is particularly important when handling the world’s biggest passenger aircraft, the A380, as at least two bridges are needed per aircraft. RIOgaleão is the only airport in Brazil able to receive an aircraft of this size.

The positive effects of the airport’s modernisation are already having an effect; new airlines have added the airport to their schedules, while existing users such as Lufthansa are increasing the frequency of their flights to and from Rio.

Related Content

  • February 1, 2021
    Crises demand digital ITS response
    Digital transformation of transport hubs will be crucial in tackling present and future challenges, and Huawei’s current Shenzhen project highlights what can be achieved
  • June 29, 2016
    Sony helps Rio get a better view of the Olympics
    With the Olympics approaching, Sony’s Stephane Clauss examines how the latest camera technologies can help cities cope with the huge crowds attending major events. This August will see more than 10,000 athletes head to Rio de Janeiro for the Olympics Games. Alongside them will be their coaching staff, a hoard of logistics teams, thousands of volunteer marshals (London 2012 had 70,000) and millions of spectators. All such major events have nervous jitters on the way to the opening ceremony. This year has see
  • October 27, 2016
    Rio’s TMC rises to Olympic challenge
    Timothy Compston lifts the lid on Rio de Janeiro’s preparations for keeping its transport systems moving during the Olympics – and the outcome. Hosting the Olympics poses major traffic management challenges for any city and Rio was no exception – especially as it is already one of the world’s most congested cities. Beyond its normal 6.5 million inhabitants wanting to carry on their daily lives, in August Rio was also home to 11,300 athletes from 206 countries. Athletes who, without fail, had to reach their
  • November 11, 2022
    Rio de Janeiro BRT win for Optibus
    Brazil's second city is adding hundreds of buses and new routes to its BRT network