Skip to main content

Largest solar highway project in the US opens to rest stop visitors

One year after breaking ground, the largest solar highway project in the US — a partnership between Portland General Electric and the Oregon Department of Transportation — is now open to visitors stopping to take a break from their travels along Interstate 5 in Oregon. Growing clean, renewable energy amongst farm fields of corn and cabbage, the Baldock Solar Station is a 1.75-megawatt solar array boasting nearly 7,000 solar panels across seven acres of the Baldock Safety Rest Area, located on Interstate 5 n
August 24, 2012 Read time: 2 mins
One year after breaking ground, the largest solar highway project in the US — a partnership between 1067 Portland General Electric and the 5837 Oregon Department of Transportation — is now open to visitors stopping to take a break from their travels along Interstate 5 in Oregon.

Growing clean, renewable energy amongst farm fields of corn and cabbage, the Baldock Solar Station is a 1.75-megawatt solar array boasting nearly 7,000 solar panels across seven acres of the Baldock Safety Rest Area, located on Interstate 5 northbound near Wilsonville. Visitors to the station can learn about solar power and Oregon’s solar highway installations through a variety of interpretive displays and walk along a sustainable community garden bordering the site created by Oregon State University Master Gardeners.

Built and operated by PGE on land owned by the Oregon Department of Transportation, the US$10 million solar array went online in January and is expected to produce 1.97 million kilowatt-hours of energy each year — equivalent to 11 per cent of ODoT’s need in PGE’s service territory.

“With this project — the largest of its kind in the nation — we’re contributing to a strong future in clean, renewable energy resources for Oregon,” said Matt Garrett, ODoT director. “It’s just one example of the kind of forward-thinking approach we can take in transportation — one that brings multiple benefits to Oregonians.”

Related Content

  • April 7, 2021
    Oregon broadens road charging approach 
    Oregon DoT testing new ways to fund transportation projects using OreGo pay-per-mile
  • April 20, 2012
    ODoT selects AeroVironment for ‘Green Highway’
    AeroVironment has been selected by the Oregon Department of Transportation (ODoT) to install its high-power Level 3 electric vehicle (EV) fast charging stations along the I-5 corridor from the California state line to the Willamette Valley. This is the beginning of the “Green Highway,” a vision for safe and consistent charging infrastructure spanning the West Coast, allowing EV drivers to travel with confidence from San Diego to Vancouver in Canada.
  • April 19, 2012
    Another section of West Coast Green Highway EV charging infrastructure announced
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • January 28, 2015
    Suppliers chosen for ODOT road user charging project
    Oregon’s Department of Transportation (ODOT) has preliminarily chosen Sanef, Verizon and telematics company Azuga as vendors in the nation’s first large scale pay-by the mile road usage charge (RUC) program, according to Michelle Godfrey, the program’s public affairs officer. Sanef was selected as the ODOT account manager to provide full turnkey mileage reporting and account management equipment and operations. The company served as the account manager in Oregon’s earlier pilot project. Verizon, alon