Skip to main content

LA metro line to be extended

The Skanska joint venture with Traylor Brothers, Inc. and J.F. Shea Construction has been awarded a design-build contract by the Los Angeles County Metropolitan Transportation Authority to extend the Los Angeles Metro Purple Line.
November 10, 2014 Read time: 1 min

The 7136 Skanska joint venture with Traylor Brothers and J.F. Shea Construction has been awarded a design-build contract by the 1795 Los Angeles County Metropolitan Transportation Authority to extend the Los Angeles Metro Purple Line.

The contract is worth a total of US$ 1.6 billion and project includes a 6.3 kilometre extension of the Purple Line, as well as train control and signals, communications, traction power supply and distribution, and fare collection systems that will connect and operate with the existing system.
 
The project schedule requires substantial completion in June 2023.

For more information on companies in this article

Related Content

  • Mileage based charging offers secure future for funding
    August 10, 2016
    HNTB’s Matthew Click sets out why a move to mileage-based pricing is inevitable. Infrastructure is the most neglected yet the most critical engine of our society, and our continued indifference could lead to a dystopian future. Our roads, bridges and highways have been largely passed by in the digital age—marginalised in an era when funding is limited and stewardship of physical assets has given way to our preoccupation with technological innovation and data—the stuff of the virtual realm.
  • Strabag subsidiary to extend tunnel transmitter system for Vienna underground
    September 17, 2015
    Strabag subsidiary, communication systems and security solutions specialist Center Communication Systems, is to modernise and extend the tunnel transmitter system for the underground metropolitan railway (U-Bahn) in Vienna.
  • Denver light rail contract awarded
    July 31, 2015
    Denver’s Regional Transportation District (RTD) Board of Directors has approved a US$140 million two-phased contract award to Balfour Beatty Infrastructure (BBII) to design and build the Southeast Rail Extension. Design will begin during the fall with construction expected to start in spring 2016. The Southeast Rail Extension will build an additional 2.3 miles of light rail on the existing Southeast Rail Line south of Lincoln. When complete it will include an end-of-line station at RidgeGate Parkway,
  • Thales provides data tool to Brescia Metro
    May 31, 2021
    Control centre to use Thales software platform for video surveillance and diagnostics