Skip to main content

Kinetic unveils Detroit EV charging initiative

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan. DTE says the ChargeD initiative is offering access to four DC fast-charger stations. Project Kinetic – whose partners include the city of Detroit and General Motors – has a mission to identify solutions that address mobility challenges. Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow r
October 1, 2019 Read time: 2 mins

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan.

DTE says the ChargeD initiative is offering access to four DC fast-charger stations.

Project Kinetic – whose partners include the city of Detroit and 948 General Motors – has a mission to identify solutions that address mobility challenges.

Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow residents, employees and users to have access to fast-charging technology, create an opportunity to educate the community about EVs and understand what it will take to scale this programme across Detroit.”

DTE installed the 4825 ChargePoint Express 250 fast-chargers with their owner and operator Blue Energy. Both companies will collect and analyse data from all four stations.

Jordan Catrine, EV charging & infrastructure manager at General Motors, says: “The new fast chargers in Beacon Park will help make owning a 1960 Chevrolet Bolt EV and other EVs more convenient than ever for people across Detroit.”

Two more chargers will be installed at Capitol Park, a public space managed by the Downtown Detroit Partnership – which will work with Next Energy to educate consumers, businesses and communities of the benefits of EVs.

Other members involved in Project Kinetic include the Michigan Economic Development Corporation, Planet M, Lear, Quicken Loans Community Fund and Bedrock Detroit.

For more information on companies in this article

Related Content

  • Utah plans road user charging by 2031
    June 30, 2021
    Utah DoT report explores expansion scenarios for alternative to state fuel tax funding
  • GetCharged unveils e-scooter charger in New York City
    August 20, 2019
    Micromobility firm GetCharged has unveiled a charging and docking station for electric scooters in New York City. Andrew Fox, GetCharged co-founder, says cities continue to use micromobility as an option to “ease pressures on public transportation and congestion”. "However, significant pitfalls remain with the dockless model, such as cluttered streets and sidewalks and the risk of fire when charging multiple scooters in residential buildings, he continues. “Charge provides vital infrastructure for riders
  • More openness - the simple answer to transport's data issues
    October 22, 2018
    Public transit agencies create a lot of data – but using it constructively to solve transportation issues has been a problem. Ben Winokur and Luke Segars think they have the answer: greater openness. Today, more people are connected through smartphones than ever before - and they’re using them for more than texting and calling. People are searching for jobs on their devices, dating, shopping and even managing their finances. But Forbes reports that only a select few companies leverage all the technology at
  • Report highlights community impact of new mobility options
    March 29, 2018
    Local authorities and communities must understand the impacts of the new mobility options and regulate to get the transport systems they want, according to a new report. Colin Sowman takes a look. Outside of the big cities plagued with congestion, the existing transportation system(s) often cope adequately, and the ongoing workload (maintenance, safety…) is more than enough to keep local transport authorities busy. Is it, therefore, a good use of public service employees’ time to keep abreast of the raft