Skip to main content

Kinetic unveils Detroit EV charging initiative

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan. DTE says the ChargeD initiative is offering access to four DC fast-charger stations. Project Kinetic – whose partners include the city of Detroit and General Motors – has a mission to identify solutions that address mobility challenges. Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow r
October 1, 2019 Read time: 2 mins

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan.

DTE says the ChargeD initiative is offering access to four DC fast-charger stations.

Project Kinetic – whose partners include the city of Detroit and 948 General Motors – has a mission to identify solutions that address mobility challenges.

Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow residents, employees and users to have access to fast-charging technology, create an opportunity to educate the community about EVs and understand what it will take to scale this programme across Detroit.”

DTE installed the 4825 ChargePoint Express 250 fast-chargers with their owner and operator Blue Energy. Both companies will collect and analyse data from all four stations.

Jordan Catrine, EV charging & infrastructure manager at General Motors, says: “The new fast chargers in Beacon Park will help make owning a 1960 Chevrolet Bolt EV and other EVs more convenient than ever for people across Detroit.”

Two more chargers will be installed at Capitol Park, a public space managed by the Downtown Detroit Partnership – which will work with Next Energy to educate consumers, businesses and communities of the benefits of EVs.

Other members involved in Project Kinetic include the Michigan Economic Development Corporation, Planet M, Lear, Quicken Loans Community Fund and Bedrock Detroit.

Related Content

  • February 19, 2021
    St. Louis to expand EV infrastructure
    Legislation will make chargers for new-builds mandatory to help city reduce GHG emissions
  • December 16, 2016
    GM to start autonomous vehicle manufacturing and testing in Michigan
    Following the signing of the SAVE Act legislation to support autonomous vehicle testing and deployment in Michigan, General Motors is to begin testing autonomous vehicles on public roads. GM also announced it will produce the next generation of its autonomous test vehicles at its Orion Township assembly plant beginning in early 2017. Testing is already underway on GM’s Technical Center campus in Warren, Michigan and will now expand to public roads on the facility’s outskirts. Within the next few months,
  • February 4, 2019
    Connected Kerb installs charging infrastructure for EVs in London
    Connected Kerb has launched its public kerbside charging infrastructure for electric vehicles (EVs) in the London borough of Southwark. The project, which is set for a city-wide rollout, stems from an agreement with Southwark Council and electricity infrastructure provider National Grid. The fibre broadband and wireless kerbsides, powered by Virgin Media, offer internet connectivity to EV drivers. Also, the solution provides environmental and traffic monitoring data for public authorities.
  • April 1, 2021
    The Ray to advance transport tech in Texas
    Collaboration includes connected and autonomous vehicle infrastructure and electric mobility