Skip to main content

Kinetic unveils Detroit EV charging initiative

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan. DTE says the ChargeD initiative is offering access to four DC fast-charger stations. Project Kinetic – whose partners include the city of Detroit and General Motors – has a mission to identify solutions that address mobility challenges. Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow r
October 1, 2019 Read time: 2 mins

A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan.

DTE says the ChargeD initiative is offering access to four DC fast-charger stations.

Project Kinetic – whose partners include the city of Detroit and 948 General Motors – has a mission to identify solutions that address mobility challenges.

Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow residents, employees and users to have access to fast-charging technology, create an opportunity to educate the community about EVs and understand what it will take to scale this programme across Detroit.”

DTE installed the 4825 ChargePoint Express 250 fast-chargers with their owner and operator Blue Energy. Both companies will collect and analyse data from all four stations.

Jordan Catrine, EV charging & infrastructure manager at General Motors, says: “The new fast chargers in Beacon Park will help make owning a 1960 Chevrolet Bolt EV and other EVs more convenient than ever for people across Detroit.”

Two more chargers will be installed at Capitol Park, a public space managed by the Downtown Detroit Partnership – which will work with Next Energy to educate consumers, businesses and communities of the benefits of EVs.

Other members involved in Project Kinetic include the Michigan Economic Development Corporation, Planet M, Lear, Quicken Loans Community Fund and Bedrock Detroit.

Related Content

  • February 19, 2024
    Don’t look at the jigsaw pieces – see the whole puzzle, says CCTA
    There are three main barriers to taking transport ideas from the pilot stage to real-life usage: incompatible technology, local control and limited funding. Tim Haile of California’s Contra Costa Transportation Authority has some thoughts on how to overcome them
  • October 21, 2016
    EV charging companies partner to expand London’s EV charging
    ChargePoint Services and BluepointLondon are to collaborate to expand the number of electric vehicle (EV) rapid chargers across London. The companies’ respective networks, GeniePoint and Source London, will also offer full inter-operability to their respective members. They say commercial EV operators who will be able to recharge vehicles in 20-40 minutes to keep their vehicles moving throughout the working day and night. For the first phase, the two companies aim to have around 30 new rapid charger
  • November 10, 2017
    IBTTA’s Jones sees turbulent times and a bright future for tolling
    Colin Sowman talks to IBTTA’s Pat Jones about the future of tolling in a fast-changing world. Pat Jones may have been executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA) for 15 years but in his words: “Never before have I seen so much change coming so fast in the transportation and tolling industry.” Amidst all this change, tolling companies are asked to provide funding for roadway building or improvements which will be repaid for over, say, a 30-year concess
  • November 23, 2017
    ABB launches 450kW fast chargers for electric buses, Gothernburg
    ABB has launched a project with Volvo Buses, Västtrafik and Göteborg Energi (GE) to supply two of its 450kW Opportunity Charging systems to charge two high capacity electric-articulated Volvo buses in Gothenburg, Sweden. These fast chargers will be installed at Sahlgrenska University Hospital and Eriksberg Square, on line 16 of the City’s bus network. The order comes after a successful two-year trial under the ElectriCity venture, during which 10 all-electric or partially electrified buses have run on the