Skip to main content

KeolisAmey reappointed to operate London's automated rail system

New eight-year €140m deal from Transport for London to run Docklands Light Railway
By Adam Hill October 7, 2024 Read time: 2 mins
The DLR has 40km of track and 45 stations and carries around 100 million passengers per year (© Anizza | Dreamstime.com)

Transport for London (TfL) has reappointed KeolisAmey to operate and maintain its automated metro network in the UK capital. 

The driverless Docklands Light Railway (DLR) opened in 1987 to cover a redeveloped docks area in the east of the city, and KeolisAmey - a joint venture between Keolis and Amey - began operating it in December 2014.

The new eight-year contract is worth around €140 million in revenue and will begin on 1 April 2025.

The DLR has 40km of track and 45 stations and carries around 100 million passengers per year.

Marie-Ange Debon, chairwoman of the Keolis Executive Board, says she is "proud of the role we have played over the past decade, setting records for ridership and customer satisfaction".

“The new DLR contract allows us to build on our work, operating one of the capital’s busiest rail networks, bringing new technologies onboard to improve passengers’ experiences and give back to local communities," adds Andy Milner, CEO of Amey.

"With new trains, greater innovation, a core commitment to decarbonising and a focus on safety for both customers and colleagues, it’s a really important time for the DLR," comments Tom Page, TfL’s general manager for DLR.

KeolisAmey says it will support TfL in introducing 54 new trains to the network, adding new timetables with increased service frequency, and deploying AI-based tech to improve passenger safety in stations and manage footfall during major events.

Keolis operates a dozen automated metro networks, including the world’s longest - in Dubai - which has 280km of lines in operation or under construction.

The first automated metro launched in 1983 in Lille, France.

For more information on companies in this article

Related Content

  • Rail Summit to discuss automated operations in Aviation and Rail, Vienna
    October 4, 2017
    The often repeated comparison between the levels of automation in the aviation and rail sectors will come under scrutiny at the Intelligent Rail Summit Vienna 28 – 30 November, according to a report in rail knowledge sharing platform Railtech.com. Dick Terleth, director mobility at ADSE consulting and avionics specialist Sander Van Lochem, will discuss automated operations and focus on the introduction, operation and lifecycle
  • New Zealand company wins London pedestrian crossing equipment contract
    March 22, 2012
    New Zealand road signal company Traffic Systems has won a contract to supply Transport for London (TfL) with pedestrian crossing equipment. It is one of two companies that have been selected to provide countdown timers for some 6,000 intersections in England’s capital. The company’s initial order, its first international contract, is for 300 units. However, Andrea Ransley, co-owner of Traffic Systems, says she is confident of further orders and says the deal is potentially worth tens of millions of dollars.
  • Kapsch communication solutions to modernise French railway
    June 4, 2014
    French railway network Réseau Ferré de France (RFF) and railway manager Synerail have appointed Kapsch CarrierCom to accelerate the modernisation of the country’s existing GSM-R network with a next generation all-IP core solution based on the new Kapsch R4 architecture. The system will provide RFF and Synerail enhanced reliability and is the basis for innovative applications such as Railway Emergency Call (eREC) or train geolocation.
  • High speed surfing in France and Italy
    May 18, 2012
    Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy. The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on th