Skip to main content

Keolis begins first section of metro system in Hyderabad, India

Keolis has begun operating the first section, 30km, of a new automated metro system of Hyderabad, Telangana State, South East India. The project, launched by the Telangana government, will run across a 68km network of three lines and 65 stations in the next few years. Once completed, it is estimated to carry 1.3 million passengers daily aims to reduce road congestion and boost the local economy.
December 4, 2017 Read time: 1 min
6546 Keolis has begun operating the first section, 30km, of a new automated metro system of Hyderabad, Telangana State, South East India. The project, launched by the Telangana government, will run across a 68km network of three lines and 65 stations in the next few years. Once completed, it is estimated to carry 1.3 million passengers daily and aims to reduce road congestion and boost the local economy.  
 
The contract was awarded by L & T Metro rail Concessionaire in 2012. It included the operation and maintenance of 57 metro trains, stations, depots, track, signalling, telecommunications, ticketing systems as well as cash dispensers.

Hyderabad Metro is equipped Communication-Based Train Control; an automatic control system which aims to achieve higher frequency and speed. The network will connect business and residential areas to the City.

For more information on companies in this article

Related Content

  • Cubic (ITMS) wins key London traffic signals maintenance contract
    August 1, 2014
    Transport for London (TfL) has awarded Cubic (ITMS), a subsidiary of Cubic Transportation Systems, a six-year contract worth some US$85 million to maintain and expand the use of intelligent traffic signals, as well as new crossings for pedestrians and cyclists, at strategic points across the city. The contract includes a provision for a further two-year extension. The Traffic Control Management Services 2 (TCMS2) contract covers the whole of London. Cubic has been assigned responsibility for 1,000 traff
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • TransCore wins new Doha airport access control system
    November 19, 2012
    US-headquartered ITS specialist TransCore is to design, implement, and maintain a state-of-the-art, radio frequency identification (RFID)-based parking and car/bus terminal access control system for authorised staff personnel of the New Doha International Airport Authority. The company was selected by Amana-Walbridge Joint Venture to install the system that will be operational during the second quarter 2013.