Skip to main content

Keolis Amey Docklands to run Docklands Light Railway until 2021

Transport for London (TfL) has named Keolis Amey Docklands as the new franchisee of the Docklands Light Railway (DLR) to operate and maintain the network until April 2021, with an option for this to be extended until 2023. Around 100 million passenger journeys are made on the DLR network annually and this new contract, with a value in excess of US$1.2 million, will commence on 7 December 2014 and will see Keolis Amey Docklands work with TfL to ensure that passengers continue to see improvements to thei
July 10, 2014 Read time: 2 mins
RSS1466 Transport for London (TfL) has named Keolis Amey Docklands as the new franchisee of the Docklands Light Railway (DLR) to operate and maintain the network until April 2021, with an option for this to be extended until 2023.
 
Around 100 million passenger journeys are made on the 6782 DLR network annually and this new contract, with a value in excess of US$1.2 million, will commence on 7 December 2014 and will see Keolis Amey Docklands work with TfL to ensure that passengers continue to see improvements to their service.   The DLR is already one of the highest performing networks in the country with train punctuality regularly above 99 per cent.

The focus for the new franchise will therefore be to maintain this performance in the context of delivering more services to meet growing demand in east London.  

TfL’s managing director of London Underground and Rail, Mike Brown, said: “The DLR is a rail network that continues to support regeneration across a huge area of London and the economic growth of the city as a whole. Its connectivity with the rest of the transport network, and its potential to connect jobs and unlock opportunities, is also set to increase further when we start to operate the Crossrail services that will interchange with it in a few years’ time.   The decision to appoint Keolis Amey Docklands was reached after a thorough and competitive procurement process, which will ensure the DLR continues to deliver an ever-improving high quality, value for money service for Londoners well into the future. I would also like to thank Serco for their support since 1997 in helping make the DLR the success story it is today.”

For more information on companies in this article

Related Content

  • ITS homes in on cycling safety
    April 9, 2014
    A new generation of ITS equipment is helping road authorities get to grips with cycle safety – and not a moment too soon as Colin Sowman discovers. Cyclists - remember them? Apparently not. At least not according to the OECD 2013 report Cycling, Health and Safety which contains the statement: ‘Cyclists are often forgotten in the design of the road traffic system’. Looking through the statistics that exist (each country appears to compile them differently) it is not difficult to see how such a conclusion cou
  • Flexible rail ticketing system uses cloud computing
    November 26, 2012
    UK-headquartered IT consultancy firm Smart421 is to design, build and manage a new Live Sales Management system for Rail Settlement Plan (RSP). This system will provide the rail industry with a flexible, high availability cloud-based solution to support ticket on departure - the collection of rail tickets from self service ticket machines after purchasing them earlier on the web.
  • Off road trials for electric highways technology
    August 11, 2015
    Following the completion of the feasibility study commissioned by Highways England into dynamic wireless power transfer technologies, off road trials of the technology needed to power electric and hybrid vehicles on England’s major roads are due to take place later this year. The trials are the first of their kind and will test how the technology would work safely and effectively on the country’s motorways and major A roads, allowing drivers of ultra-low emission vehicles to travel long distances without
  • New system expedites border crossings
    October 28, 2016
    Enforcing border controls can create long queues for travellers, David Crawford looks at potential solutions. Long delays at border crossings in both North America and Europe have sparked the development of new queue visualisation and management technologies that are cutting hours, even days, off international passenger and freight journeys. At the westernmost end of the 2,019km (1,250 mile) Mexico–US frontier, two parallel crossings between Tijuana, in the former country, and the border city of San Diego,