Skip to main content

Karachi plans BRT system

The government of Sindh in Pakistan is planning to implement a bus rapid transit (BRT) system in Karachi and the first phase will cost US$5 million. The system will enable 200 buses to carry around 15,000 passengers an hour and there will be special lanes for buses to operate.
July 17, 2012 Read time: 1 min
The government of Sindh in Pakistan is planning to implement a bus rapid transit (BRT) system in Karachi and the first phase will cost US$5 million. The system will enable 200 buses to carry around 15,000 passengers an hour and there will be special lanes for buses to operate. The government plans to expand the BRT system to Hyderabad, Sukkur and other cities in the province after the first phase is completed.

Related Content

  • Hydrogen electric bus hits streets of Moscow
    September 20, 2021
    Vehicle can cover a distance of 250km and only needs refuelling once a day 
  • Road Zipper focus for Lindsay
    September 7, 2016
    Lindsay Transportation Solutions will attend the 2016 ITS World Congress Melbourne with a focus on the Road Zipper system for ITS applications. A moveable barrier system that quickly reconfigures the road to mitigate congestion, while providing positive barrier protection between opposing lanes of traffic, it can be used to create flexible bus rapid transit (BRT) corridors that can be returned to traffic during non-commute periods to maximize the full use of the roadway.
  • Smart road layout with Lindsay’s Road Zipper
    October 10, 2016
    Lindsay Transportation Solutions is focusing on its Road Zipper system for ITS applications. This moveable barrier system quickly reconfigures the road to mitigate congestion, while providing positive barrier protection between opposing lanes of traffic.
  • China launches nation-wide ETC
    December 1, 2014
    China is to launch a national unified electronic toll collection (ETC) system in 2015 in a bid to solve freeway congestion, save logistics cost and cut emissions. The national ETC network will be primarily completed by the end of 2015 based on a regional system that will cover 14 provinces by this year end, said Xu Chengguang, spokesman of the Ministry of Transport (MOT). The ministry expects around 25 percent of passenger cars to be equipped with transponders and all toll stations along major express