Skip to main content

Kapsch supplies GSM-R solution to Saudi Arabia

Kapsch CarrierCom is to supply its GSM-R railway communications solution for a prestigious project in the Kingdom of Saudi Arabia, to ensure safe train operations on the 450 km high speed line between the holy cities of Mecca and Medina. The contract, awarded by Indra and the Saudi Railways Organisation, utilises the latest technology based on the European Rail Traffic Management System (ERTMS) level 2. The rail line will connect multiple urban regions as well as the international King Abdullah Airport. The
June 24, 2013 Read time: 2 mins
81 Kapsch CarrierCom is to supply its GSM-R railway communications solution for a prestigious project in the Kingdom of Saudi Arabia, to ensure safe train operations on the 450 km high speed line between the holy cities of Mecca and Medina.

The contract, awarded by 509 Indra and the Saudi Railways Organisation, utilises the latest technology based on the European Rail Traffic Management System (ERTMS) level 2.
 
The rail line will connect multiple urban regions as well as the international King Abdullah Airport. The route features expansive stretches of desert with difficult climatic conditions and high temperature fluctuations.
 
To ensure smooth and safe operation of the line, a fail-safe architecture was designed with built-in redundancy, using four-fold network coverage, ensuring that if three base stations in a region fail, a fourth can still serve the entire area. The core based on the newest R4 technology provides full redundancy and will be operated at two different locations.

“We acquired experience with similar environmental conditions in a project in Algeria and we have already equipped multiple railway stretches with similarly advanced solutions supporting ERTMS Level 2 in high speed environment. We are particularly pleased that Kapsch can contribute to passenger security and comfort on the world’s most important pilgrimage route,” says Michel Clement, vice-president railways of Kapsch CarrierCom.

For more information on companies in this article

Related Content

  • Hitachi Rail Europe wins UK first traffic management contract
    July 28, 2015
    Passengers on some of the busiest commuter lines in the UK can look forward to more frequent and more reliable trains following a deal to provide new traffic management technology on the Thameslink route through central London. Network Rail and the Thameslink Programme have signed a contract with Hitachi Rail Europe (HRE) to deliver a step-change in technology through state-of-the-art traffic management technology.
  • LiDAR sets its sights on future problems
    February 23, 2017
    AAdvances in LiDAR are helping transport authorities improve services and identify potential problem areas, as geospatial technology expert Dr Neil Slatcher explains. The effects of climate change on the transport infrastructure have long been a cause of concern within the transportation sector - and not only on the structures themselves but also on the surrounding areas. This year, those concerns have become reality with landslides, structural collapses and surfacing issues impacting services across the wo
  • Thales to upgrade Norwegian railway
    September 6, 2012
    Thales has announced that it has been awarded a framework contract by the Norwegian rail administrator, Jernbaneverket (JBV), to supply a new railway signal interlocking system. The first three projects in the contract, worth over US$41,400,000, are for new signalling systems for the Sandnes-Stavanger line, the Ganddal cargo terminal and Høvik station.
  • Major setback for California bullet train
    August 27, 2013
    The California High-Speed Rail project, which aims to connect the mega-regions of the state, contribute to economic development and a cleaner environment, create jobs and preserve agricultural and protected lands, was dealt a serious blow when Judge Michael Kenny of the Sacramento Superior Court ruled that the California High-Speed Rail Authority "abused its discretion by approving a funding plan that did not comply with the requirements of the law."