Skip to main content

Kapsch supplies GSM-R solution to Saudi Arabia

Kapsch CarrierCom is to supply its GSM-R railway communications solution for a prestigious project in the Kingdom of Saudi Arabia, to ensure safe train operations on the 450 km high speed line between the holy cities of Mecca and Medina. The contract, awarded by Indra and the Saudi Railways Organisation, utilises the latest technology based on the European Rail Traffic Management System (ERTMS) level 2. The rail line will connect multiple urban regions as well as the international King Abdullah Airport. The
June 24, 2013 Read time: 2 mins
81 Kapsch CarrierCom is to supply its GSM-R railway communications solution for a prestigious project in the Kingdom of Saudi Arabia, to ensure safe train operations on the 450 km high speed line between the holy cities of Mecca and Medina.

The contract, awarded by 509 Indra and the Saudi Railways Organisation, utilises the latest technology based on the European Rail Traffic Management System (ERTMS) level 2.
 
The rail line will connect multiple urban regions as well as the international King Abdullah Airport. The route features expansive stretches of desert with difficult climatic conditions and high temperature fluctuations.
 
To ensure smooth and safe operation of the line, a fail-safe architecture was designed with built-in redundancy, using four-fold network coverage, ensuring that if three base stations in a region fail, a fourth can still serve the entire area. The core based on the newest R4 technology provides full redundancy and will be operated at two different locations.

“We acquired experience with similar environmental conditions in a project in Algeria and we have already equipped multiple railway stretches with similarly advanced solutions supporting ERTMS Level 2 in high speed environment. We are particularly pleased that Kapsch can contribute to passenger security and comfort on the world’s most important pilgrimage route,” says Michel Clement, vice-president railways of Kapsch CarrierCom.

Related Content

  • August 8, 2014
    Kapsch completes major GSM-R projects
    Kapsch CarrierCom has completed the implementation of European Train Control Systems (ETCS) on two rail routes in the Czech republic. The two routes, Lanžhot in the Czech Republic to Kúty in Ukraine and Břeclav, Czech Republic to Hohenau, Austria, have been equipped with GSM for railways (GSM-R) technology to provide standardised signalling, control and train safety.
  • December 17, 2012
    Kapsch to maintain UK rail GSM-R network
    Austrian rail telecommunication systems integrator Kapsch CarrierCom has been awarded the contract to maintain the entire GSM-R (Global System for Mobile Communications – Railway) network on behalf of British railway infrastructure operator Network Rail. The multi-year agreement will see Kapsch supporting Network Rail’s control centre team to ensure the highest levels of network availability, enabling higher frequency of train services and greater safety standards. GSM-R is an international wireless communi
  • April 17, 2012
    Thales delivers ATO system for the Mecca metro
    Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
  • November 4, 2024
    Saudi Intermobility Expo 2024 brings transport to fore
    Event runs 11-13 November at the Jeddah International Exhibition & Convention Center