Skip to main content

Kapsch to provide radio infrastructure for Rio metro

Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil. Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines. With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bott
January 27, 2015 Read time: 2 mins
81 Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil.

Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines.

With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bottlenecks. The line will be open before the 2016 Olympic Games in Rio, helping hundreds of thousands of sports fans reach their destinations quickly, safely and in comfort.

Kari Kapsch, CEO of Kapsch CarrierCom, says, “We are excited to be working on this major infrastructure project lead by ENG for Rio de Janeiro metro, one of the Latin America’s fastest-growing and most dynamic cities.”

Cristiano de Mendonça, CTO MetrôRio, says, “The TETRA radio network is a critical element of this historic project and Kapsch offers exactly the skills, technology and commitment we need to ensure that services on the new Line 4 run smoothly and safely during the Olympic Games and long into the future.”

For more information on companies in this article

Related Content

  • Chile plans feasibility studies to extend three metro lines
    March 14, 2014
    Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • Transportation demand plan pronounced a success
    June 28, 2013
    Sam Schwartz Engineering (SSE)’s Transportation Demand Management (TDM) Plan for the Barclays Center, a multi-purpose indoor arena in Brooklyn, New York was recently pronounced a success in headlines across the city. The arena hosts the National Basketball Association’s Brooklyn Nets, as well over 200 other annual events including concerts, conventions and other sports. It is within walking distance of eleven New York City Transit (NYCT) subway lines, directly across the street from a Long Island Rail Road