Skip to main content

Kapsch to provide radio infrastructure for Rio metro

Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil. Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines. With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bott
January 27, 2015 Read time: 2 mins
81 Kapsch has been selected to provide the TETRA radio infrastructure for a new metro line in Rio de Janeiro, Brazil.

Kapsch will provide four base stations, 30 in-train cab radios and 140 hand-held portable radios, as well as planning, design and deployment, to integration with existing communications systems on other metro lines.

With 15 trains serving six major stations, the new Line 4 will take more than 2,000 cars off the road at peak times, helping to resolve some of the city’s worst traffic bottlenecks. The line will be open before the 2016 Olympic Games in Rio, helping hundreds of thousands of sports fans reach their destinations quickly, safely and in comfort.

Kari Kapsch, CEO of Kapsch CarrierCom, says, “We are excited to be working on this major infrastructure project lead by ENG for Rio de Janeiro metro, one of the Latin America’s fastest-growing and most dynamic cities.”

Cristiano de Mendonça, CTO MetrôRio, says, “The TETRA radio network is a critical element of this historic project and Kapsch offers exactly the skills, technology and commitment we need to ensure that services on the new Line 4 run smoothly and safely during the Olympic Games and long into the future.”

Related Content

  • November 15, 2013
    Maintaining momentum: learning lessons from the London Olympics
    Japan will not only host this year’s ITS World Congress but has been selected for the 2020 Olympics. So what can Japan, and indeed Brazil, learn from the traffic management for London 2012 - Geoff Hadwick finds out. It was a key moment when Olympic boss Jacques Rogge signed off London 2012, calling the Games “happy and glorious.” Scarred by the logistical disaster of Atlanta 1996 and the last-minute building panic for Athens 2008, Rogge clearly thought London 2012 was an object lesson in how to plan and
  • April 23, 2014
    Brazil to invest US$16 billion in Río Olympics
    Officials in Brazil have estimated the total cost of infrastructure and works related to the 2016 Summer Olympics in Rio de Janiero to be US$16.3, with 60 per cent of the funds coming from private investors. Some US$2.5 billion of the overall budget would be spent on projects exclusively directed to the event, Agência Brasil reports. Río de Janeiro city itself will invest US$6.3 billion in fourteen projects, including light rail transit and bus rapid transit projects, as well as drainage works in the
  • April 30, 2015
    Cable cars come of age in trans-continental expansion
    David Crawford explores a high-level option of public transport. Sharing its origin with that of ski lifts at winter sports resorts in the European Alps, urban aerial cable transport is attracting growing interest as a low-footprint, low-energy alternative to conventional public transport that can swoop over ground-level traffic congestion.
  • June 14, 2018
    Keeping people on track is RATP’s raison d’etre
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule