Skip to main content

Kapsch to implement digital train radio system in Ireland

The Irish railway operator "Iarnród Éireann - Irish Rail" (IÉ) has awarded the implementation of a digital train radio system for the DART (Dublin Area Rapid Transit) region to Kapsch CarrierCom.
March 14, 2012 Read time: 1 min
The Irish railway operator "3893 Iarnród Éireann - Irish Rail" (IÉ) has awarded the implementation of a digital train radio system for the DART (Dublin Area Rapid Transit) region to 81 Kapsch CarrierCom. This contract includes an upgrade of the analogue railway system to GSM-R with innovative IP based release 4 architecture.

In a first step, Kapsch CarrierCom will equip a 48 km pilot line, after which the system will be deployed on some 2,000kms of lines, with an additional service contract also planned.

For more information on companies in this article

Related Content

  • Xerox’s mobility app offers Mobility as a Service
    June 1, 2016
    Andrew Bardin Williams looks at a new mobility app in Los Angeles and Denver that brings Mobility as a Service one step closer. Commuting today doesn’t have to require a single modal route. You can take Uber to the nearest light-rail station or a bus to the commuter line. Then on the other end of your trip, you can book a bikeshare the rest of the way to your office. For many who live in major metropolitan areas around the US this is a distinct reality as new ways to move from Point A to Point B continue to
  • Magnadata Group wins $37.35 million rail ticket contract
    February 1, 2012
    UK-headquartered Magnadata Group has been awarded a five-year, US$37.35 million contract by ATOC (Association of Train Operating Companies) to produce the iconic orange magnetic rail ticket and associated products for all the UK train operating companies.
  • Bill introduced in US Senate to extend positive train control deadline
    March 6, 2015
    Four US senators have introduced the bipartisan Railroad Safety and Positive Train Control Extension Act in an effort to extend the deadline for full implementation of positive train control (PTC) on US railroads to 2020. Missouri has 4,400 miles of main rail track that are operated by 19 different railway companies. PTC is a technology designed to automatically stop or slow a train before certain collisions. The Rail Safety Improvement Act of 2008 mandates that PTC must be installed by31 December 2015. PT
  • Data exploits parking potential
    March 11, 2015
    David Crawford parallel parks with innovations in two continents. Surveys of US cities indicate that drivers searching for parking can account for up to 37% of all urban traffic congestion. A 2011 study by IBM of 20 cities around the world found that nearly six out of ten drivers had abandoned their search for a parking space at least once; while motorists generally spent on average 20 minutes looking for a sought-after spot.