Skip to main content

Kapsch granted approval for first GSM-R system in Poland

The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route. The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the European Union’s new Technical Specifications for Interoperability (TSI) for the control-command an
May 27, 2014 Read time: 2 mins
The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by 81 Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route.

The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the 1816 European Union’s new Technical Specifications for Interoperability (TSI) for the control-command and signalling subsystem (CCS).

TSI requirements lay down the functional and technical requirements to be met by sub-systems of European Rail Traffic Management System (ERTMS) and the interfaces in relation to other sub-systems and have to be met on all trans-European conventional and high speed railway lines. The GSM-R system installed by Kapsch meets these requirements and is compatible with other sub-systems. GSM-R is part of the ERTMS system being implemented in the European Union.

European Rail Traffic Management System (ERTMS) is an initiative backed by the European Union to enhance cross-border interoperability and the procurement of signalingequipment by creating a single Europe-wide standard for train control and command systems.

“We are excited about the certification, it proves that Kapsch has met all of the new technical specifications set out by the European Union and that we can provide the best solutions possible to our customers ", says Rainer Lasch, Head of Railway Regulatory Affairs at Kapsch CarrierCom.

For more information on companies in this article

Related Content

  • EU supports key TEN-T infrastructure projects
    July 31, 2014
    In the last Calls of the trans-European transport network (TEN-T) Programme, the European Commission selected a total of 106 projects that will benefit from over US$428 million in EU support for improving transport infrastructure across Europe. The 52 projects selected from the 2013 Multi-Annual Call and 54 from the 2013 Annual Call will use the EU’s financial support to bring forward the completion of the TEN-T network as well as studying innovative ways of reducing the transport sector’s carbon footprint.
  • App improves EU’s Galileo Green Lanes
    May 12, 2020
    More transparency ahead for better management of European Union border points
  • Making ITS connections requires leadership
    January 23, 2020
    From making the commute more bearable to saving the planet, Jim Alfred of BlackBerry Certicom believes that ITS has the capacity to drive a range of transformational opportunities – but leadership is required, he warns
  • Developing ‘next generation’ traffic control centre technology
    July 4, 2012
    The Rijkswaterstaat and Highways Agency have joined forces to investigate what the market can do to realise an idealistic vision for traffic control centre technology. Jon Masters reports One particular seminar session of the Intertraffic show in Amsterdam in March was notably over subscribed. So heavy was the press to attend that your author, making his way over late from another appointment, could not get in and found himself craning over other heads locked outside to overhear what was being said. The