Skip to main content

Kapsch granted approval for first GSM-R system in Poland

The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route. The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the European Union’s new Technical Specifications for Interoperability (TSI) for the control-command an
May 27, 2014 Read time: 2 mins
The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by 81 Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route.

The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the 1816 European Union’s new Technical Specifications for Interoperability (TSI) for the control-command and signalling subsystem (CCS).

TSI requirements lay down the functional and technical requirements to be met by sub-systems of European Rail Traffic Management System (ERTMS) and the interfaces in relation to other sub-systems and have to be met on all trans-European conventional and high speed railway lines. The GSM-R system installed by Kapsch meets these requirements and is compatible with other sub-systems. GSM-R is part of the ERTMS system being implemented in the European Union.

European Rail Traffic Management System (ERTMS) is an initiative backed by the European Union to enhance cross-border interoperability and the procurement of signalingequipment by creating a single Europe-wide standard for train control and command systems.

“We are excited about the certification, it proves that Kapsch has met all of the new technical specifications set out by the European Union and that we can provide the best solutions possible to our customers ", says Rainer Lasch, Head of Railway Regulatory Affairs at Kapsch CarrierCom.

For more information on companies in this article

Related Content

  • Mobinet counters weighty cross border concerns
    November 9, 2017
    A Mobinet pilot is combining onboard weighing with V2X comms to streamline vehicle weight enforcement. David Crawford reports. Pan-European, cross-border weigh-in-motion (WIM) for trucks is now a practical possibility, following successful Scandinavian trials within the EU-co-funded Mobinet (Internet of Mobility) programme. New technology is using strain sensors, located on load-bearing components and routinely installed in truck fleet management systems.
  • Professional training key to the future of ITS
    May 21, 2012
    A substantial portfolio of resources is available and expanding, to help employers and professionals build essential skills for current and future needs – the ITS Professional Capacity Building Program. Pete Goldin reports. The US Department of Transportation (USDOT) views ITS as key to the future of transportation, as is evident from the department’s ITS Professional Capacity Building (PCB) program. This is a further manifestation of USDOT’s commitment to ITS. The PCB program provides anyone in the transpo
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.