Skip to main content

Kapsch granted approval for first GSM-R system in Poland

The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route. The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the European Union’s new Technical Specifications for Interoperability (TSI) for the control-command an
May 27, 2014 Read time: 2 mins
The President of the Polish Office of Rail Transportation (UTK) has granted approval for the operation of the Global System for Mobile Communications - Railway (GSM-R) system implemented by 81 Kapsch CarrierCom on route E30 on the Bielawa Dolna–Węgliniec–Legnica route.

The authorisation recognises, for the first time in Europe, that implementation of the GSM-R system has been completed in compliance with the 1816 European Union’s new Technical Specifications for Interoperability (TSI) for the control-command and signalling subsystem (CCS).

TSI requirements lay down the functional and technical requirements to be met by sub-systems of European Rail Traffic Management System (ERTMS) and the interfaces in relation to other sub-systems and have to be met on all trans-European conventional and high speed railway lines. The GSM-R system installed by Kapsch meets these requirements and is compatible with other sub-systems. GSM-R is part of the ERTMS system being implemented in the European Union.

European Rail Traffic Management System (ERTMS) is an initiative backed by the European Union to enhance cross-border interoperability and the procurement of signalingequipment by creating a single Europe-wide standard for train control and command systems.

“We are excited about the certification, it proves that Kapsch has met all of the new technical specifications set out by the European Union and that we can provide the best solutions possible to our customers ", says Rainer Lasch, Head of Railway Regulatory Affairs at Kapsch CarrierCom.

For more information on companies in this article

Related Content

  • European e-call and Russian Era-Glonass interoperability demonstrated
    July 15, 2014
    To demonstrate the interoperability between the European eCall system and the Russian Era-Glonass system, Glonass Union, VTT, Gemalto and Fujitsu Ten recently participated in live simultaneous demonstrations in Europe and Russia. To help mitigate the consequences of serious road accidents, the European Commission (EC) has adopted a proposal for a regulation concerning a type-approval requirement for deployment of the eCall system. In Russia, a technical regulation on wheeled-vehicle safety with Era-Glona
  • EU to fund common train control system
    April 15, 2015
    The EU's TEN-T Programme is to provide funding of over US$16 million for the development and installation of the common European Train Control System (ETCS) in Belgium, Luxembourg, Denmark and the UK. The new system is expected to improve the interoperability, safety, reliability and capacity on European railways. Seven separate projects aim to contribute to the deployment of the European Rail Traffic Management System (ERTMS) in the EU and enhance interoperability of European rail services. While increa
  • Changes needed to Italy's enforcement tendering?
    February 2, 2012
    Fixed penalty notices KRIA's co-founder and President Stefano Arrighetti discusses the events which led up to investigations into the fraudulent use of his company's T-RED red light enforcement system and his house arrest. Looking forward, he says, there needs to be fundamental reform of how Italy goes about the enforcement contract tendering process
  • EU releases first transport infrastructure funds
    April 8, 2014
    Following its decision in March to make the first US$16.4 billion tranche of funding available for trans-European transport network projects, the European commission has now adopted the first work programmes within this framework: a multi-annual work programme covering larger projects with a total budget of US$15.1 billion and an annual work programme for 2014 addressing smaller projects with a budget of US1.3 billion. The funding priorities set out in these programmes include: The closing of missing lin