Skip to main content

Kapsch completes major GSM-R projects

Kapsch CarrierCom has completed the implementation of European Train Control Systems (ETCS) on two rail routes in the Czech republic. The two routes, Lanžhot in the Czech Republic to Kúty in Ukraine and Břeclav, Czech Republic to Hohenau, Austria, have been equipped with GSM for railways (GSM-R) technology to provide standardised signalling, control and train safety.
August 8, 2014 Read time: 1 min

81 Kapsch CarrierCom has completed the implementation of European Train Control Systems (ETCS) on two rail routes in the Czech republic. The two routes, Lanžhot in the Czech Republic to Kúty in Ukraine and Břeclav, Czech Republic to Hohenau, Austria, have been equipped with GSM for railways (GSM-R) technology to provide standardised signalling, control and train safety.

The two projects consisted of the implementation of geo-redundant GSM-R core networks and base stations, together with technical support for the Czech Railway Infrastructure Administration (SŽDC).  
 
“We are very proud that we can contribute to the smooth interworking of radio communication systems on European railways. Existing gaps are being filled at a rapid pace,” says Horst Kaufmann, head of sales GSM-R for the CEE region at Kapsch CarrierCom.

For more information on companies in this article

Related Content

  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • Kapsch wins Latvia traffic contract
    February 9, 2023
    Drivers on E-67 highway around Latvian capital Riga will benefit from real-time info
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Siemens, Thales land Spanish train deal
    November 25, 2014
    Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal