Skip to main content

Kapsch CarrierCom implements radio network for Rio De Janeiro metro line

Kapsch CarrierCom has provided the TETRA (Terrestrial Trunked Radio) communications infrastructure for Line 4 in Rio de Janeiro, Brazil, which began operating on 1 August, in time for the 2016 Olympic Games. TETRA offers voice and data connectivity that is dedicated, secure and highly reliable, ensuring optimal network performance. It facilitates communication for the operator, transmits relevant operational data, and makes a key contribution to an increasing passenger safety and efficiency. The compa
August 5, 2016 Read time: 2 mins
81 Kapsch CarrierCom has provided the TETRA (Terrestrial Trunked Radio) communications infrastructure for Line 4 in Rio de Janeiro, Brazil, which began operating on 1 August, in time for the 2016 Olympic Games.

TETRA offers voice and data connectivity that is dedicated, secure and highly reliable, ensuring optimal network performance. It facilitates communication for the operator, transmits relevant operational data, and makes a key contribution to an increasing passenger safety and efficiency.

The company was awarded the contract by project lead ENG and also provided four base stations, 60 in-train cab radios, 21 optical repeaters and 140 hand-held portable radios. In cooperation with Dutch software company Rohill, the TETRA infrastructure was integrated with the existing Lines 1 and 2 and the third line support. Cobham Wireless installed a distributed antenna system solution for indoor coverage, including tunnel, technical rooms and platforms, while Schnoor delivered the cabin radio solution for trains with a public announcement interface.

With 15 trains serving six major stations on 16km, the new Line 4 in Rio De Janeiro is able to carry over 300,000 people per day and to takes almost 2,000 cars off the road during rush hour. During the Olympic Games, the metro line will contribute to faster and more convenient travel in Brazil’s second largest city.

For more information on companies in this article

Related Content

  • Panama's metro line 2 awarded
    May 18, 2015
    The concession to build Panama City's metro line No. 2 has been awarded to a consortium comprised of Brazilian company Norberto Odebrecht and Spanish infrastructure giant FCC. The 22 kilometre long elevated line will connect the city's northern and eastern sectors and line No. 1. The consortium, known as Consorcio Línea 2, offered US$1.86 billion for civil works, US$50.7 million for maintenance works, and US$214 million for financing, totalling roughly US$2.2bn, according to Metro de Panama.
  • Freight poses growing problem for city authorities
    March 3, 2017
    Wes Guckert considers possible solutions and countermeasures to the problems of increased freight deliveries in growing cities. In January 2016, the US Department of Transportation (USDoT) conducted a session on the SmartCity Challenge and Urban Freight and Logistics. This session was a follow-up to the USDoT report titled, Beyond Traffic 2045.
  • Driverless cars will be on UK roads within four years, says minister
    October 4, 2018
    Fully driverless cars will enter the UK in three to four years, says transport secretary Chris Grayling at the Conservative Party conference in the city of Birmingham. A report by Reuters says Grayling is committed to ending the sale of new diesel and petrol cars by 2040. “Newer diesel cars today are cleaner than ever before and of course there will be a role for diesel for many years to come as technology evolves,” Grayling adds. However, OpenText has carried out a survey of 2,000 UK consumers,
  • Serco wins Dubai Metro contract extension to 2021
    April 10, 2019
    Serco has signed a two-year extension with Dubai’s Roads and Transport Authority (RTA) to continue operating and maintaining Dubai Metro until September 2021. HE Mattar Al Tayer, director general and chairman of the board of executive directors of the RTA, says: “Serco has delivered operational performance levels on the Dubai Metro with a high train service availability of 99.9% and a punctuality of 99.8%, achieving a record of 204 million journeys in 2018.” The £140m contract includes the operation