Skip to main content

Kapsch awarded Polish GSM-R contract

Polish rail infrastructure manager PKP Polskie Linie Kolejowe (PKP PLK) has awarded Kapsch CarrierCom a US$12 million contract to design and install GSM-R equipment for the roll-out of European Rail Traffic Management System (ERTMS) on the 148 km Legnica - Wrocław - Opole section of corridor E30. The contract covers the expansion of existing base station controller (BSC) and transcoder unit infrastructure, together with the installation of thirty-two BTS 9000 base stations at sixteen locations. Kapsch is to
April 30, 2013 Read time: 1 min
Polish rail infrastructure manager PKP Polskie Linie Kolejowe (PKP PLK) has awarded 81 Kapsch CarrierCom a US$12 million contract to design and install GSM-R equipment for the roll-out of European Rail Traffic Management System (ERTMS) on the 148 km Legnica - Wrocław - Opole section of corridor E30.

The contract covers the expansion of existing base station controller (BSC) and transcoder unit infrastructure, together with the installation of thirty-two BTS 9000 base stations at sixteen locations. Kapsch is to undertake the installation work in co-operation with local partner Torpol.

The project is scheduled for completion in two years, with a five-year warranty period during which Kapsch will provide technical support.

For more information on companies in this article

Related Content

  • Parsons Brinckerhoff to modernise Michigan freeway
    July 4, 2014
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
  • Thales to implement traffic control system on Spanish rail line
    October 7, 2015
    Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved
  • South west’s first smart motorway opens
    January 15, 2014
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • Dynamic lane closures cuts time, cost and congestion on Motorway roadworks
    March 17, 2014
    A combination of technologies is leading to major congestion and cost reductions during roadworks on the UK’s motorway network. Innovative construction programme scheduling technology and the deployment of moveable barriers has achieved substantial savings of money and time on UK motorway roadworks managed by the Highways Agency (HA). This combination has set the scene for a new generation of road usage analysis tools. The HA’s objective was to reduce the congestion caused by lane closures during roa