Skip to main content

Kapsch awarded Polish GSM-R contract

Polish rail infrastructure manager PKP Polskie Linie Kolejowe (PKP PLK) has awarded Kapsch CarrierCom a US$12 million contract to design and install GSM-R equipment for the roll-out of European Rail Traffic Management System (ERTMS) on the 148 km Legnica - Wrocław - Opole section of corridor E30. The contract covers the expansion of existing base station controller (BSC) and transcoder unit infrastructure, together with the installation of thirty-two BTS 9000 base stations at sixteen locations. Kapsch is to
April 30, 2013 Read time: 1 min
Polish rail infrastructure manager PKP Polskie Linie Kolejowe (PKP PLK) has awarded 81 Kapsch CarrierCom a US$12 million contract to design and install GSM-R equipment for the roll-out of European Rail Traffic Management System (ERTMS) on the 148 km Legnica - Wrocław - Opole section of corridor E30.

The contract covers the expansion of existing base station controller (BSC) and transcoder unit infrastructure, together with the installation of thirty-two BTS 9000 base stations at sixteen locations. Kapsch is to undertake the installation work in co-operation with local partner Torpol.

The project is scheduled for completion in two years, with a five-year warranty period during which Kapsch will provide technical support.

For more information on companies in this article

Related Content

  • Kapsch sets course for higher profitability
    February 26, 2015
    Kapsch TrafficCom experienced stable business development in the first three quarters of 2014/2015 with existing installation and operation projects. The Group was also able to obtain a number of new orders in Australia during the third quarter, although new major orders, upon which the innovation and growth plans are based, remained elusive due to the lack of corresponding invitations to tender. Revenue of the Group during the first three quarters of the 2014/15 fiscal year was US$283.5 million, slightly b
  • Indra to implement high speed rail traffic management system
    September 8, 2014
    State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
  • UK digital Railway contracts awarded
    June 21, 2016
    WSP/Parsons Brinckerhoff has been appointed by the UK’s Network Rail to provide design and engineering services on the Digital Railway’s Multi-Functional Design Framework (MFD). The digital railway is a government supported, industry-wide programme aimed at increasing the role of digital technologies to improve capacity, connectivity and reliability. Through the framework WSP/Parsons Brinckerhoff will provide a range of strategic engineering and project management services to support the delivery of the
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.