Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

Related Content

  • Moscow pins hopes on V2X
    March 18, 2020
    A new transport strategy is aimed at creating conditions for the introduction of new ITS developments within Moscow – and 5G and V2X are on the agenda
  • Kapsch TrafficCom awarded Texas tollway extension project
    February 18, 2014
    Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners Segments 3 LLC to provide the toll collection, intelligent transportation and network communication systems for the NTE extension project. The NTE extension is approximately ten miles long, and runs along I-35W north of the city of Fort Worth. Kapsch will deliver ten all-electronic toll zones, including dynamic sign equipment and road sensors that provide the data to enable dynamic toll charges based upon actual traffic
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Multi-modal’s long road into the transportation mainstream
    June 4, 2015
    Andrew Bardin Williams looks at 20 years of multimodal transport in the Sun Belt and beyond and the key requirement for user engagement. Phoenix residents will head to the polls in August to decide whether to implement a three-tenths of a cent sales tax to fund the city’s new multimodal transportation plan. It will be the second transportation-related sales tax hike in the past 15 years yet city officials and advocates expect the resolution to easily pass—despite the strong anti-tax environment that has dom