Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

Related Content

  • September 22, 2016
    Highway upgrade features Australian first intersection design
    A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • July 31, 2012
    Kapsch wins Texas tolling projects
    Kapsch TrafficCom IVHS, a subsidiary of Kapsch TrafficCom, has been selected to design, build, and integrate the managed lane system (MLS) for both the North Tarrant Express (NTE) and LBJ Express projects in Dallas and Tarrant Counties in North Texas.
  • June 2, 2014
    Developer selected for Dallas Airport freeway project
    Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The Texas Transportation Commission has awarded a contract to Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.