Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

Related Content

  • January 3, 2024
    Yutraffic Varia chosen for Sydney's new harbour crossing
    Western Harbour Tunnel is being built to take pressure off existing routes in Australian city
  • October 21, 2014
    London’s strategy to tackle air quality problems
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • December 19, 2017
    USDoT pilots show win-win potential for connected vehicles
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • April 2, 2014
    The great pay divide
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle