Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

For more information on companies in this article

Related Content

  • San Diego: Let there be (street)light
    March 30, 2020
    The influence of intelligent streetlights is spreading. David Crawford finds that San Diego’s deployment – and attendant legislation – may offer a blueprint for other cities going forward
  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • Turning information into stories
    April 16, 2018
    IBTTA says its TollMiner tool can transform transportation planning. Here, the tolling organisation explains how it works – and what part it might play in Donald Trump’s infrastructure plan. Imagine being able to turn the black-and-white numbers in a spreadsheet into graphics and visualisations that tell a compelling story about essential transportation infrastructure. Having easy access to the solid, reliable data you need to plan surface transportation projects and assign project resources based on
  • Traffic management market ‘to surpass US$22 billion by 2021’
    May 9, 2016
    Increasing traffic congestion, rising vehicle fleet size and growing technological advances will drive global traffic management market through 2021, according to the latest TechSci Research report, Global Traffic Management Market by Transportation Mode, By System Type, By Region, Competition Forecast and Opportunities, 2011-2021. According to the research, the global market for traffic management is projected to surpass US$22 billion by 2021, due to rising demand for traffic management in roadways, ra