Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

For more information on companies in this article

Related Content

  • Texas toll road contract awarded
    March 2, 2015
    The Texas Transportation Commission has awarded a contract to the Blueridge Transportation Group for the the planning, construction, financing, operation and maintenance of an express toll road and additional infrastructures for the SH 288 toll lanes project in Harris County in Texas. The consortium includes Israel-based Shikun & Binui Holdings, together with an infrastructure contractor and a financial investor. The ten mile stretch of road will connect Harris County to Houston. The project includes constr
  • US ITS systems approach critical decision time
    February 6, 2012
    Connie Sorrell, chair of the ITS America Annual Meeting and Exposition, explains why ITS in America is approaching a critical crossroads
  • US ITS systems approach critical decision time
    February 3, 2012
    Connie Sorrell, chair of the ITS America Annual Meeting and Exposition, explains why ITS in America is approaching a critical crossroads. Connie Sorrell, as Chief of Systems Operations for the Virginia Department of Transportation, doesn't normally speak in hyperbole, but she can't help but be enthusiastic about this year's ITS America's annual meeting in the nation's capitol, 1-3 June, 2009. Certainly, as Chair of the 2009 ITS America Annual Meeting and Exposition, like everyone who has performed this impo
  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser