Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

For more information on companies in this article

Related Content

  • Elon Musk’s underground movement
    August 3, 2020
    The Boring Company is building tunnels under various US cities – but for what? Kristina Smith delves deep into a project which may (eventually) have real appeal for mass transit providers and transportation agencies
  • JV selected for Perth’s Forrestfield-Airport Link
    February 23, 2016
    The Public Transport Authority of Western Australia has selected the Salini Impregilo - NRW Joint Venture, comprising Salini Impregilo and NRW Pty, as its preferred bidder to design, construct and maintain the Forrestfield-Airport Link. The US$1.5 billion state government-funded project is a new train line that will connect Forrestfield to the city, opening up Perth’s eastern suburbs to the rail network for the first time and giving Perth Airport users a travel option five minutes faster than by car.
  • Huawei's ORT tech removes highway toll gates
    August 26, 2020
    Road tolling operations will be transformed by new revenue collection possibilities
  • Syracuse models post-industrial revival for US cities
    August 13, 2015
    A connective corridor in Syracuse, New York State, could be a model for other post-industrial cities, as David Crawford discovers. The aim of the city of Syracuse’ 5.6km-long Connective Corridor in Onandaga County in upstate New York is to create a model ‘complete street’ for use in wider regeneration schemes. Key transport-sector components are traffic calming, high-quality transit with accessible passenger information, plus walkability and bike-friendliness.