Skip to main content

JV wins multi-billion dollar West Gate Tunnel project

CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
April 11, 2017 Read time: 2 mins
CPB Contractors has been selected by Australian toll road operator 600 Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with 7770 John Holland.

The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne.

Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as building a 2.8km eastbound tunnel and 4km westbound tunnel, a new bridge over the Maribyrnong River providing an alternative to the West Gate Bridge, an elevated road along Footscray Road to the Port of Melbourne, CityLink and the city’s north and major new cycling and pedestrian paths.

Subject to planning approvals, construction is expected to start in 2018 with the project scheduled to open to traffic in 2022.

Related Content

  • December 17, 2018
    Kapsch to deploy tolling roadside systems in Australia
    Kapsch TrafficCom Australia is to deliver a tolling roadside system for two projects in Melbourne and Sydney for a combined value of AUD$30 million (£17m). In Melbourne, Kapsch’s tolling technology will be utilised in the West Gate Tunnel Project, an initiative which seeks to establish a second river crossing in the city and remove thousands of trucks from residential streets. Part of an agreement between two contractors: CPB Contractors John Holland Joint Venture (CPBJH JV), the full scope of the contr
  • June 18, 2013
    Melbourne installs smart road technology
    Work is now underway on installing the latest electronic freeway management technology along Melbourne’s West Gate Freeway in Victoria, Australia, with the entire project to be completed by the middle of next year. Installation of the freeway management system along more of Melbourne’s road network will be fully integrated with the one already in use on the M1 east of Williamstown Road as well as that proposed for the M80 Ring Road, according to Victorian Roads (VicRoads) minister Terry Mulder. “Indeed, ou
  • August 23, 2013
    Sensys sensors for Melbourne freeway
    Work is now underway on installing the latest electronic freeway management technology along the West Gate Freeway in Melbourne, with the entire project to be completed by the middle of next year. Sensys wireless vehicle detection sensors are being installed as part of the US$23.7 million project, which is jointly funded by the federal and Victorian governments. The project includes variable message signs and closed circuit television as well as upgrades to the supporting communication networks and cent
  • October 21, 2020
    Vitronic Australia wins CityLink toll upgrade
    Manufacturer will supply video and DSRC tech to Melbourne's arterial 22km route