Skip to main content

Jakarta kicks off second ERP trial

The Jakarta administration is set to kick off a second trial run of the electronic road pricing scheme aimed at helping ease traffic congestion, with the aim of having the system up and running by January 2016. Norway-based Q-Free has set up a gantry with cameras and sensors for the trial run in South Jakarta. The system works by detecting cars passing beneath it, and then remotely deducting a toll from a stored-value card in an on-board unit (OBU) inside the vehicle. OBUs have been installed in 100 car
October 2, 2014 Read time: 2 mins
The Jakarta administration is set to kick off a second trial run of the electronic road pricing scheme aimed at helping ease traffic congestion, with the aim of having the system up and running by January 2016.

Norway-based 108 Q-Free has set up a gantry with cameras and sensors for the trial run in South Jakarta.  The system works by detecting cars passing beneath it, and then remotely deducting a toll from a stored-value card in an on-board unit (OBU) inside the vehicle. OBUs have been installed in 100 cars for the trial.

A previous trial, also held in South Jakarta, was carried out in July by Vienna company 81 Kapsch and deemed a success by Deputy Governor Basuki Tjahaja Purnama. However, according to Muhammad Akbar, the Jakarta transportation office chief, a recurring problem during that trial was the inability of the cameras on the gantry to correctly identify the licence plates of all vehicles, which Akbar said was due to the non-standard typeface used on Indonesian licence plates.

“There’s so much variation in the typeface, and most of them aren’t the standard ones issued by the police,” he said. “A lot of them are made by vendors by the side of the road. That’s why we need an ERP system that can read even a modified plate.”

The city administration plans to put the project out to tender at the end of this year, with both Kapsch and Q-Free expected to tender for the contract.

Akbar said that if the contract was finalised by February 2015, work could begin on building gantries in the streets covered by the scheme, with the ERP program being implemented in January 2016.

An agency is to be set up to manage the program, including handling the tolls collected and coordinating the traffic enforcement related to ERP violations.

For more information on companies in this article

Related Content

  • Do satellites provide a heavenly view of tolling’s future?
    December 16, 2014
    Satellite-based tolling opens up new options for authorities and can be integrated with DSRC systems as David Crawford discovers. As the proud custodian of the European Union (EU)’s longest road network covered by a single (truck) charging scheme – and the only one to include all major roads - Slovakia has become the continent’s poster-nation for the virtues of GNSS/CN (Global Navigation Satellite System/Cellular Network)-based tolling. It is also proved to be a very fast implementer. Speaking at the 2014 I
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.