Skip to main content

Jacobs WSP/Parsons Brinckerhoff JV wins engineering excellence award

The work of a Jacobs WSP/Parsons Brinckerhoff design joint venture on the North Strathfield Rail Underpass (NSRU) in New South Wales has been awarded an Australian Engineering Excellence Award (AEEA), which recognises outstanding achievement in the practice of engineering and service to the profession. The NSRU project was part of the Northern Sydney Freight Corridor Program, a joint Australian and NSW Government initiative to improve the capacity and reliability of freight trains between Strathfield an
October 13, 2016 Read time: 2 mins
The work of a Jacobs 8556 WSP | Parsons Brinckerhoff design joint venture on the North Strathfield Rail Underpass (NSRU) in New South Wales has been awarded an Australian Engineering Excellence Award (AEEA), which recognises outstanding achievement in the practice of engineering and service to the profession.

The NSRU project was part of the Northern Sydney Freight Corridor Program, a joint Australian and NSW Government initiative to improve the capacity and reliability of freight trains between Strathfield and Newcastle. The 148-metre rail underpass allows freight trains to cross under the busy Main North Line without impacting faster passenger services. The team developed an innovative design – a shallow-cover, driven tunnel – allowing the project to be completed five months ahead of schedule.

The NSRU design was undertaken by the Jacobs WSP/Parsons Brinckerhoff joint venture with support from 1869 Mott Macdonald. The design team was part of the NSRU Alliance comprising Transport for NSW, 7769 Bouygues Travaux Publics and 7770 John Holland. The NSRU was officially opened in June 2015.

For more information on companies in this article

Related Content

  • Double awards for Cubic and TfL’s contactless payment system
    March 19, 2015
    Cubic Transportation Systems and Transport for London’s (TfL) contactless bankcard payment system are the proud recipients of two prestigious awards for Outstanding Project at the 2015 UK Rail Industry Awards, followed by Most Innovative Transport Project at the London Transport Awards. Launched in 2012, the contactless bankcard system was extended in 2014 to cover London’s entire transit network – including Tube, rail, and bus and tram services. The success of the contactless payment project in London is b
  • ‘Formation flying’ engineering trains used to upgrade railway
    February 16, 2017
    In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
  • CTS extends contactless payments to Sydney's trains
    November 28, 2018
    Cubic Transportation Systems (CTS) is extending Sydney’s contactless payment system beyond light rail and ferries to include the Australian city’s train network. The technology allows commuters to pay for ticketing via credit cards, smart watches and other electronic devices, alongside the Opal card. CTS’s Asia-Pacific team and Transport for New South Wales initially made the contactless system available for the city’s Manly ferry service in 2017. In March this year, the contactless system was ext
  • Consortium to build Denver’s north metro rail line
    November 28, 2013
    A consortium including Graham, Stantec, Parsons Brinckerhoff, Balfour Beatty and Hamon Constructors (GBBH) has been awarded a US$343 million contract by Denver’s Regional Transportation District (RTD) to design and build the north metro rail line. The North Metro project, part of RTD’s sprawling FasTracks transit network, is a proposed 18.4 mile electrified commuter rail line that will connect Denver and Adams County by serving Commerce City, Northglenn and Thornton. Construction begins in 2014 and t