Skip to main content

Jacobs wins role for revised Mayor's Transport for London Strategy

Jacobs Engineering Group has been awarded a two-year contract by Transport for London (TfL) to provide integrated impact assessment (IIA) services to support development and finalisation of the revised Mayor’s Transport Strategy (MTS) for London. Jacobs is providing assessment of the potential environmental, health, equality and economic impacts of the proposed new strategy, including specific topics such as community safety.
February 3, 2017 Read time: 1 min
6320 Jacobs Engineering Group has been awarded a two-year contract by 1466 Transport for London (TfL) to provide integrated impact assessment (IIA) services to support development and finalisation of the revised Mayor’s Transport Strategy (MTS) for London.

Jacobs is providing assessment of the potential environmental, health, equality and economic impacts of the proposed new strategy, including specific topics such as community safety.

Related Content

  • April 4, 2013
    Ticketless travel for London’s commuters?
    London's commuters will be able to use their mobile phones and bank cards for travel across the city, if Transport for London's (TfL) plans come to fruition. Thousands of London bus users already pay their fares using contactless bank cards instead of TfL Oyster cards, which have been widely used over the past decade. Users pay different charges for different London Underground zones and for train travel, so TfL has to decide on suitable payment mechanisms, and could drive the widespread adoption of systems
  • November 11, 2022
    Keeping cool in LA
    As the earth’s temperatures rise, cities are set to become hotter. A project in Los Angeles may point the way to keeping cool while improving access to transit services in an uncertain future
  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • June 22, 2017
    FTA says new London road charging proposals present opportunities and challenges
    The UK’s Freight Transport Association (FTA) says new proposals announced by the Mayor of London for road charging based on elements such as distance travelled and vehicle emissions could be a positive step for freight operators, provided they don’t simply add cost.